My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4205 S 3RD AVE 2018-01-02 MF Import
>
Address Records
>
S 3RD AVE
>
4205
>
4205 S 3RD AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 3:58:42 PM
Creation date
3/8/2017 12:46:12 AM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
4205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i— 0 9 T H U a 6 = 2 9 C A S C A L F_ TES. <br />CASCADE GEOTECHNICAL <br />A DIVISION OF CASCADE TESTING LABORATORY, INC. <br />12919N.E 126TH PLACE KIRKLAND, WASHINGTON 98034 <br />I. KIRKLAND: (206) 621.5080 SEATTLE: (206) 52S.6700 <br />May 2, 1988 <br />Job No. 884-21G <br />Town a Country Steel Buildings <br />Division of PermaBilt <br />16521 Highway 99, Suite B <br />Lynnwood, Washington 98037 <br />Attentions Gary Crane <br />References Fulton Project <br />4205 S. 3rd Avenue <br />Everett, Washington <br />Dear Mr. Cranes <br />L3��0� w' r� <br />MAY 6 1988 <br />EVERETT BUILDING DEPT <br />P.02 <br />At your request, a geologist from Cascade Geotechnical visited <br />the above site to observe the native subgrade soil conditions and <br />to perform in -place density tests on the compacted fill placed in <br />the slab area of the proposed building. <br />As we understand it, the project will consist of a pole building <br />with a slab on grade floor. The footings will consist of a <br />thickened slab. we understand that the perimeter footings will <br />bear on the top of an ecology block wall stacked two (2) high. <br />We understand that the area inside the ecology block perimeter was <br />backfilled to the bottom of slab elevation using fill consisting of <br />gray sand screenings. sill was placed against the outside of the <br />ecology blocks as well. The north, west and south sides of the <br />proposed building were backfilled to the top of the second row of <br />ecology blocks. The east side was back filled to the bottom of the <br />second row, leaving most of the second row exposed. The fill <br />appeared to be very firm and was non -yielding beneath the tires of <br />a bnckhoe. In -place density tests were performed in two (2) <br />locations within the building area. Test #1 was performed in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.