Laserfiche WebLink
� <br />,Y�C., <br />AEPAIR SP=CZFZC�1:'ZONS AYD LIST OP WORR TO 3E 3ID <br />Page 2 of 5 <br />Addre=s: 4219 S 3rd <br />1. Roofing & Gutters Tear off existing roofing complete <br />to sheathing. Tear off existing brick chimney below <br />roof line. Replace barge board on north side of east <br />end of main house gable. Replace bracket in northeast <br />corner of house under new batge board. Check for rotted <br />materials in corner under bracket. Replace all rotted <br />rafter tails and soffit with new materials to match <br />existing. Remove existing gutters. Verify removal of <br />:ettcd materials with Housing Improvement Advisor prior <br />to covering. <br />Install cedar sheke shingle roof complete. Shakes . <br />24", medium or better, approved foc 10" exposuce by the <br />manufacturer with double starter course and 30# asphalt <br />impregnated felt interlayment. install zinc moss <br />prevention strips to all ridge aceas_ <br />Install new 1 x 6 tight knot cedar facia on all eaves. <br />Prime with oil base primer prior to installing new <br />gutters. Install new continuous aluminum 5" gutters, <br />type "K", baked-on enamel finish, on all existing <br />eaves. Secure gutters 49" O.C. and slope to drain to <br />downspouts. Seal all joints with manufacturer's <br />approved caulking. Install new matching tubular <br />downspouts to run into existing drain system. Secure <br />duNnspout sections with pop rivets and secure to house <br />at top and bottom. Owner cl�oice of gutter color. <br />s 33ov — <br />7.. Sidin9 Tear off all existing siding £rom the south <br />facade of the main section of the house (excluding the <br />back additian) to sheathing. Install new clear• beveled <br />cedar siding over sheathing to match the rest of the <br />house siding. Replace broken and damage�i sections ot <br />siding on the rest of the house. Install new flashing <br />at steps from sliding door. <br />Power wash siding complete and scrape all loose and <br />peeling paint from existing siding and trim. Apply oil <br />based primer to all new and bare wood. Paint entire <br />house with two coats of exterior grade latex paint, two <br />colors. Owner choice of color. <br />$ 2�0� — <br />3_ Doors & Windows Replace existing £ront door with new <br />pre-primed, pre-hung metal 6 panel insulated dooc <br />includi��g magnetic weatherstripping and threshold, <br />Stanley or equal. Paint exterior to match trim paint <br />color. Install new latch and deadbolt lock hardware, <br />Schlage or equal. Install peephole at eye level. <br />Install new anodized aluminum threshold with neoprene <br />weatherstrip at back door to replace existing. <br />