Laserfiche WebLink
R_'-.?:,I3 S?�CIc?C::'_'ZG�:S :.2dD .T.iST OF 'r70?ti( TO 3E 22D <br />` i„�r <br />. Page <br />Address: 5017 S. 3rd <br />3 of 11 <br />Walls <br />Insta'.1 fiberglass batt insulation in cavities of firred <br />out concrete walls, 2" thick with £oil or kraft paper <br />backing. Install 4" fiberglass batt insulation on <br />exteri�r wood frame walls, £oil or kcaft backed. <br />Install 1/2" gypsum wallboard on all .interior wa11 <br />surfaces including stairwell area on main floor. Use <br />waher resistant type in the bathroom.. Use 5/8" gwb on <br />Nalls adjacent to carport. Tape and spackle all new <br />walls for smooth wall finish. Install a11 necessary <br />metal edge beads grior to taping. Hold gwb minimum 1!2" <br />above Eloor slab Chroughout. Install mahogany •�000 base <br />trim, 1-5/8", throughout after flooring is installed by <br />owner. <br />install wood siding to exterior of new carpor` wall to <br />match existing house siding. Siding : installed over <br />1/2" CDX sheathiny and �15 asphalt impcegnaced felt. <br />In:.::all 4' high wa11 on north side of kitchen cabinWtb: <br />er.tending 30" past cabinets for owner's range, g. <br />both sides. Provile two coats polyurethane varnish on <br />trim. <br />Ceilin <br />Install new suspended acousticai ceiling throughout new <br />basement apartment area. Ceiling system : exposed grid <br />type using minimum 5/8" thick tiles, 24" x 24" or 12" x <br />24", minimum NRC of .50, including all necessary hanger <br />wires and grid chann�ls. Install ceiling approximately <br />a" below ceiling joists. System : accessible. <br />Qw ��i J�� ' . <br />5, L'abinets & Countertops Install new kitchen cabinets <br />in basement as shown in drawings. Cabinets : parti�le <br />boarv and plastic iaminate veneec, wood grain style, <br />Western Cabinets, "Danish'; Oak" or equal. Cabinets : <br />securely attached to solid backing and leveled for new <br />countertops. <br />Construct new countertops over • base cabinets. <br />Countertops • 3/4" particle board covered with high <br />pressure plastic laminate, securely attached to base <br />cabinets. Laminate : cover exposed edges and minimum 4" <br />up any adjacent walls, owner choice of color and style. <br />$ 1 tJ5 - <br />6, Doors & Windows Install two new exterior doors Eor <br />basement apartment. Kitchen door . flush, soLid core, <br />same size as existing with one 24" x 24" lite. Living <br />coom door : solid core, 3' 0', f.lush with oeep hole and <br />automatic closec. Install new hardware on both doors, <br />including hinges, 1" throw deadbolt lock with interior <br />latch, locking latchset and weatherstripping on all <br />sides and r.ew thresholds. Owner choice of finish on <br />door, hardiaare : b�ass finish. Replace casing and jamb <br />on kitchen door as necessary, li��ing room door : new <br />jamb and casing, trim height of door to clear glue-1am <br />beam. <br />s <br />z <br />0 <br />�--I <br />., <br />� <br />m <br />-� T <br />.. -� <br />v+ x <br />0 <br />m <br />co <br />mo <br />r: <br />-I c <br />o - <br />m <br />_ -�i <br />m <br />o� <br />c <br />� -� <br />r= <br />�� <br />< <br />T <br />O z <br />TI D <br />-i fri <br />x <br />m� <br />� <br />0 <br />c�i m <br />c v+ <br />3 ln <br />m <br />� <br />=i r <br />m <br />1• <br />�, <br />_, <br />� <br />� <br />c <br />_, <br />�: <br />r <br />