Laserfiche WebLink
Langus Homes Inc. <br />Plan Check N50244 <br />December 12, 1995 - Page 2 of 2 <br />7. <br />8. <br />9. <br />10. <br />Specify nailing per Table 23-1-Q. <br />Show all posu on plan including built-up Zx's at braced wall panels and at point loads. <br />The building is by detinitinn "unusually shaped" per Section 2326.4.4. Provide doubfe joists <br />under braced wall panels per Section 2326.5.4.1 UBC. <br />When requirecl by Secuon 2326.11.4, show si::e, location and embedment length of hold down <br />anchors on foundation pian. Note on plan that hold down hardware must be secured in place <br />prior to foundation inspection. <br />11. Detail ty�ical foundation section for interior bearing st/foorin and beam/beam connections. <br />12. Provide. positive connection at all posdbeam, P g <br />Specify connectors on plans• <br />13. Specify the beam support at the left end of the 3-118"x10-1/2" GLB in basement. Show size of <br />beam p�ket if beam is set into the concrete wall. ndicular to <br />14. Specify connection cf floor joists to basement wall. Show joists parallel and perpe <br />concrete walls• Show blocking where joists aze parallel to concrete walls. <br />In order for the processing of your application to continue, it will be necessary to provide the Building <br />Division with two complete sets of drawings reflecting the corrections requested. <br />Upon resubmitGl of the drawings, your application will be given priority and plan review wi11 <br />commence. <br />All required submittals shall be of sufficienc deGtil and contain sufticient information to ensure that the <br />proposed s[ructure will be consvucted in compliance with all adopo:d codes. <br />Sincerely, <br />��� ����-- <br />Jeff Heilman <br />Development Technician <br />1H:jcUDccltrs.duc(41 <br />