Laserfiche WebLink
on projecled water usage and can be substantial. Applicant is encouraged to obtain a <br />copy of the Ordinance and determine estimated charges prior to building permit <br />application. The actual charges shall be computed by the Public Works Department per <br />lhe ordinance in effect at lhe time and according lo the information on the approved <br />plans at the time o( building permit issuance. <br />8. Extensicn of the sewer main may be required to service this property as determined by <br />ihe City sawer deparlment. <br />9, Approval oi consiruction plans will require demonstration that atl pertinent standards <br />and regulations are met. <br />10. City streets and alleys are to be kept clear of dirt and debris at all times during <br />construction. Dust suppression and street cieaning must occur as directed by the <br />Public Works Inspector. <br />11. A one year warranty is required on the public improvement for an amount not less ihan <br />10°'0 of lhe cosl of construction and shall run for one year from the date of (inal <br />approvaUissuance of the first Occupancy Permit. <br />12. As-builts oF storm sewer, sanilary sewer, and water syslems will be required to be <br />submitled per Ciry Design and Construction Slandards and Specifications for <br />Development. <br />13. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br />Inspeclor. <br />14. �taximum drive�vay grade is 15°�o wilhout engineering approval and vertical curves for <br />transitions. Pave driveway (rom the duplex to exisling street. <br />15. �fhe construction plans must be designed from a site survey perform^d by a liconsed <br />Stale of Washington land surveyor. <br />1G. Soil compaction lesling shall be per(ormed throughout the consUuction of the public <br />street and utilities. Densiry curves shall be submitted to the Public Works Department <br />prior to permits beinc� issued for any aspect of the project. All �vork performed by the <br />geotechnical engineer or testing lab shall be reported direcUy to the City Public Works <br />Inspector before covering �vork can be continued by the conlractor. Daily reports shall <br />bo kepl by the soils investigatodtester and submitted to the Public Works Inspector <br />wilhin 24 haurs. <br />17. Ali exposed ground must be reseeded wilhin 30 days of the complelion of construction. <br />IF reseeding is not practical due to wealher or seasonal problems, the ground must be <br />covered evith mulch as direcled by the City Engineer. <br />18. Temporary erosion control measures for conslruction activity musl be operational prior <br />lo commencement o( any clearing or earthwork. <br />19. Stormwater runoff from iinpervicus areas must be managed to prevent erosion or <br />tloo�inc� o( adjacent properties. A drainage design must be submitled to and approved <br />by lhe Ciry prior to final approval. <br />20, Tliis construction will raquire a building eni�it <br />r, <br />: 2q10 ��'cimurc, tiuilc 3-:\, I�n �rr�t. \\':\ 9;t 01- d'd (a2>) ?j7-8731, Gas (�l25) 2i7-R7d2 <br />