My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3624 UPLAND AVE 2018-01-02 MF Import
>
Address Records
>
UPLAND AVE
>
3624
>
3624 UPLAND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:55:49 PM
Creation date
3/8/2017 8:07:44 AM
Metadata
Fields
Template:
Address Document
Street Name
UPLAND AVE
Street Number
3624
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> q c H E H 0 A A N D U H <br /> b H N <br /> y � H <br /> � H A <br /> � y S <br /> � T0: Linda Gough, Code Comrliance <br /> o � � FROP1: Dennis lleich, Ecvironcental Planner <br /> N m � <br /> N � RS DATE: June 17, 1991 1 tj <br /> � '3 ttl <br /> H y RE; Harrigan Residence Resroration Plan <br /> N <br /> O N <br /> a� � r <br /> � � N The followiag ar� comments that perrain ro the Harrlgan residence restoration <br /> plan, dated Pfarch 5, 1991, and our meerin� �rith P1rs. Hairigan on ffay 21, 1991. <br /> The March 5, 1991 cite plan is considerably different ttien the �,revious site <br /> plan dated August 1990. The major diffeLence� include the incorporation of a <br /> rockery, a pond, a cantilevered deck, a trail down the slope, a new streambed <br /> down the slope, and a r.imber bin wall. <br /> These are significant changes to the site plan that have a potential effect on <br /> ESA's. Prior to approving this proposal, the city Will require the folloxing <br /> infornacioc in compliance with Title 37 EMC. <br /> ��-� �� 1. Geotechnical report that addresses slope srlhility of <br /> I ��' existing soils and potential instability 1f the various <br /> � proposal� are implemented. <br /> � � 2. Detailed constructlon plans that include discussion o¢ <br /> � �'1 techniques to limit erosion, slope iastability, timing, <br /> �.,.,. <br /> equipment, etc. <br /> 3. Wetland report that delineaces and claesifies any <br /> wetlands on site. If any of the proposed projeccs <br /> ! �► <br /> impact a wecland, the report must address appzopriate <br /> mitigation. <br /> �,� 4. Stream report that addresses r.he stream to be <br /> � constructed and hoa it will cor�iect vtith EdgeNater <br /> Creek. Appropriate Washington Sta�e Hydraulic permits <br /> will have to be obtained thtough Washington State <br /> �' Department of Wildlife. <br /> ��� . <br /> �o� <br /> 653dm <br /> I �� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.