My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3624 UPLAND AVE 2018-01-02 MF Import
>
Address Records
>
UPLAND AVE
>
3624
>
3624 UPLAND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:55:49 PM
Creation date
3/8/2017 8:07:44 AM
Metadata
Fields
Template:
Address Document
Street Name
UPLAND AVE
Street Number
3624
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,,,.,.,. <br /> � � ro <br /> � <br /> H <br /> 9 H [�n <br /> H � H �+;' �. l �-� � �I� <br /> � ¢ � � PUBL/C bV0/�C5 ; - _ V; � <br /> � Hro :f� <br /> � <br /> N M �IT,=i��'J I <br /> e � � <br /> ta ' <br /> � � � � ,. <br /> c� • <br /> ti <br /> Z y � <br /> � F+ H <br /> d y H I <br /> RoN <br /> � � � <br /> � N I <br /> July 9, 1991 <br /> Mr. Tim Harrigan <br /> 3624 Upland Ave. � <br /> Everett, WA. 98204 <br /> i � <br /> I �"j <br /> � Subject: Consttuction of Rockety, Pond, Deck and 8in Walls � <br /> i � <br /> I ��"� Dear Mr. Harrigan: <br /> �,�� <br /> The Public Woxks and Planning Departments have completed an initial [eview of <br /> this proposal. The Planning Departmene has given us a list of requirments <br /> necessary for approval of the proposal. They are as follows: <br /> I �� <br /> 1. Geotechnical renort that addresses slopa stability of existing soils and <br /> poteneial instability if the various proposals are implemented. <br /> � <br /> �.�� 2. Detailed construction plans that include discussion on techniques to limit <br /> erosion, slope instability, timing, equipment, etc. <br /> � �. ; Wecland report thac delineates and classifies any wetlands on sice. If <br /> � .�I,� any of ehe proposed projects impact a wetland, the eepott must address <br /> appro;+riate mitigation. <br /> �'� 4. Stream report tha[ addresses the strearo to be cunstruc[ed and how it will <br /> �.�1 connect with Ed�ewater Creek. Appropriate Washington State Hydraulic <br /> permits wi11 have to be obtained throu�h Washington State Depattment of <br /> � 57ildlife. <br /> i <br /> I <br /> � <br /> i <br /> CITY OF EVERE i f•32C0 Cadar Slreet• Everett,WA 98201 • (206) 259-8800• Faz (206) 259-8882 ��u I <br />
The URL can be used to link to this page
Your browser does not support the video tag.