Laserfiche WebLink
. Y <br /> �i ���i,� �O� <br /> �.�` . � <br /> February 5, 1996 j <br /> I <br /> i <br /> I <br /> Greenspace Inc i <br /> 11215 - 19th Ave SE <br /> Everett WA 9820E <br /> RE: Owner: Alice Taylor <br /> Job Address: 4729 Vie�v Dri��e <br /> Plan Check No. 5015G <br /> Dear Sir: <br /> In response to yuur application for a construction permit, your plans have been examined and you aze <br /> advised that the issuance of a pemtit is being withheld for the reasons listed below. These comments <br /> address building issues only, additional revisions or additions may be required by other departments (such <br /> as Utilities, Planning or Fire). All references refer to the 1994 Uniform Building Code, as amended by the <br /> State of Washington and/or Washington State Energy Code 1995 Editinn, unless stated othenvise. <br /> In order for the processing c� ;�ur application to continue, it will be necessary to provide the <br /> Euilding Division wilh two compfete new sets of drawings reflectfng the corrections requested. <br /> 1. Update code references to 1994 Uniform Building Code (l1BC). Several Code sections are <br /> incorrectly called out on the notes sheet. <br /> 2. Show how dwelling is provided with cornfort heating facilities capable of maintaining a room <br /> temperature of 70° F (21°C) at a point 3 feet (914 mm) above the floor in all habitable <br /> rooms/310.11 UBC. <br /> 3. Provide tempered glass at required hazardous locations. Show on plans. � <br /> 4. Note on Plans: `Skylights to conform with UBC section 2409.2"specify glazing type on plans. � <br /> Also note curb heights. � <br /> � <br /> 5. Provide details for min 36"high guardrail at enclosed floor and roof openings, open and glazed <br /> sides of stairways, landings and ramps, balconies or porches, which are more than 30 inches (762 i <br /> mm) above grade or floor below, and roofs used for other than service of the building. Open � , <br /> guardrails shall have intermediate rails or omamental pattem such that a sphere 4" (102 mm) in <br /> diameter cannot pass through. <br /> i <br /> � <br /> 6. Provide detail of attic ventilation type, size and location. Show the required net area calculations <br /> assuming approximately 75% of the vent area is nr.t area unless the actual net area is given from the <br /> manufacturer/1505.3 UBC. Show both trussed roof and stick framed roof. � <br /> CITY OF EVERETT•3200 Cedar Street • Everett,WA 9820� • (206) 259-860U• Fax (206) 259•8856 <br />