Laserfiche WebLink
r, <br /> 5. Task 16B—The City that HDR provide a peer review of a another water line design project <br /> under this contract. <br /> 6. Task 16C—The City has requested that HDR add to our scope of services an update of the <br /> Watershed Control Plan for$17,950. <br /> 7. Summary of additional out of scope services provided to date(not included in Amendment No. <br /> 1). These additional services and budgets have been approved via e-mail and are to be <br /> budgeted in Amendment No. 2. <br /> Task No. Item Estimated <br /> Additional Cost <br /> 5 Additional population/demand forecasting services $11,100 <br /> 5 (using Services to correct pressure zone/GIS flow $1,440* (*use <br /> 16A budget) allocation data provided by the City Task 16A budget— <br /> not ineld. in total) <br /> 6 Additional services related to the Conservation Plan $5,970 <br /> chapter analysis and additional Everett conservation <br /> measures. <br /> 7 Additional Watershed modeling and scenario $2,800 <br /> analysis—working with UW <br /> 9 System analysis modeling delays, modeling review $8,600 <br /> services, data discrepancies, and diurnal curve redo <br /> with new meter information. <br /> 9 City request for HDR to reallocate demands to new $3,220 <br /> hydraulic model <br /> 16B Waterline design peer review $1,700 <br /> 16C Watershed Control Plan Update $17,950 <br /> Total Amendment No. 1 Item 3 Additional Cost $51,340 <br /> Amendment Item 4 - Additional Water Plan Services from August 2006 <br /> to Project End (estimated June 2007) <br /> 1. Task 1 —Project management—the existing contract completion date is December 31,2006. <br /> Extend the contract expiration date to June 30, 2007. Cost impact: $4,000 ($2,000 covered <br /> with existing budget transfer). <br /> 2. Task 5 —Additional November and December revisions of the flow forecasts analysis as a <br /> result of the follow-up comments from wholesale customers—approximately 36 hours. Cost <br /> impact: $3,800. <br /> 3. Task 9 —Reevaluation of the system for 1,000 gpm fire flow in addition to the originally <br /> agreed-upon 1,500-2,000 gpm fire flow—approximately 68 hours. Cost impact: $8,500. <br /> 4. Task 9—Made additional corrections to small pipes diameters in the model to reflect client's <br /> research into these incorrectly characterized pipes—approximately 16 hours plus additional <br /> time spent because these pipes caused problems with the system modeling calibration and <br /> modeling. Cost impact: $1,900. <br /> 5. Task 15 —Final Plan Assembly—We were not budgeted to prepare the intermediate draft plan <br /> that was put together and sent to the City in December. That submittal used up most of the <br /> budget allocated for the DOH plan submittal. Approximately half of the expended budget is <br /> 19 applicable to the DOH plan submittal. Cost impact: $3,400 +$1,500 printing. <br /> Everett CWP 7 of 8 Amendment No. 1-Exhibit A-1 <br />