My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 11:55:14 AM
Creation date
3/8/2017 11:54:20 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 2 Hours and Budget Detail (Budgeted as Task 16A) <br /> Graham <br /> Subtask Jason Kelly or Word <br /> Lemieux O'Rourke Howie Proc. Totals <br /> Subtask 1: Initial Information 8 2 4 0 14 <br /> Gathering and Review <br /> Subtask 2: Data Analysis 48 8 10 0 66 <br /> Subtask 3: Meetings and 16 0 4 0 20 <br /> Communications <br /> Subtask 4: Deliverable 28 2 4 6 40 <br /> Subtask 5: Contingency Analysis TBD TBD TBD TBD TBD <br /> Total Hours (Subtasks 1-4) 100 12 22 6 I 140 <br /> Contract Hourly Rates I + $4.10/hr <br /> 89.03 90.31 167.30 71.45 - $574 <br /> Tech <br /> Charge <br /> Total Budget(Subtasks 1-4) $8,903 $1,084 $3,681 $429 $14,671 <br /> Total Amendment Item 2 additional cost: $14,671 <br /> Amendment Item 3 - Additional Water Plan Services from October 2005 <br /> through July 2006 <br /> The following additional services were identified through July 2006. <br /> 1. Task 5 -During development of the projected retail service area demands we identified an <br /> error in the City provided pressure zone GIS data. The error is in the attribute table that <br /> describes the pressure zone name, code, and head number for each pressure zone. This table <br /> contained either old or incorrectly assigned head numbers. The pressure zone head was by <br /> HDR to distribute PSRC projected demographic data to each of Everett's pressure zones. These <br /> demographics serve as the basis for the demand forecast. Because the head numbers in GIS <br /> table were incorrect the distribution of demographics and demand s to pressure zones needed to <br /> be rerun before the demands could be used in the modeling. <br /> 2. Task 6-Conservation additional services and budget approved for conservation model <br /> customization and additional conservation measure scenarios. <br /> 3. Task 7-The modeling software analysis had to be changed to determine that the UW <br /> recommended version of PowerSim software would not run the UW provided model and then <br /> develop a workaround solution to the problem (8 hours). The scope was written assuming that <br /> HDR would use the 1999-2000 model which had been set up to run the Everett yield scenarios. <br /> However the UW provided an updated 2005 model that did not include Everett's yield <br /> scenarios. About 20 additional hours were then required to troubleshoot and run the revised <br /> model with Everett's yield scenarios. <br /> 4. Task 9-System Analysis schedule and budget impacts resulting from delay in receiving the <br /> hydraulic model demand information for calibration, inaccurate model demand allocations, and <br /> additional as-requested modeling services. The City requested that HDR take demand <br /> information and allocate demands to the hydraulic model. The estimated cost for these <br /> additional services is $3,220. Additional delay in receiving calibrated EPS model from Silver <br /> Lake. All three models are in different coordinate systems which complicates the following 1 8 <br /> tasks: model merge (Silver Lake, Mukilteo and Everett models), demand allocation, population <br /> of transmission line elevations and calibration. <br /> Everett CWP 6 of 8 Amendment No. I-Exhibit A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.