Laserfiche WebLink
Upon submittal of the drawings, your application will be given priority and plan review <br />will commence. <br />All required submittals shah be of sufficient detail and contain sufficient information to <br />ensure tha; the proposed structure will be constructed in compliance with all adopted <br />codes. <br />Sincerely, <br />Jeff Heilman <br />Development Technician <br />IH:jd:pc545P: <br />