Laserfiche WebLink
DECEMBER 5, 1995 <br />CITY OF EVERETT; PUBLIC WORKS; ATTN.: TIM TYLER <br />CC. DEVCON INC.; SECOND BAPTIST CHURCH <br />RE: ADDITIUNS AND ALTERATIONS OF SECOND BAPTIST <br />CHURCH <br />DEAR TIM, <br />ON APPROX. OCT. 25, 1995 EXCAVATION OF THE CHURCH <br />BASEMENT WAS BEGUN 8Y DEVCON INC, HEAVY RAINS CAUSED <br />OFF SITE WATER FROM BUILDINGS LOCATED EAST AND NORTH <br />OF THE CHURCH TO DISCHARGE ROOF AND SITE STORM WATER <br />ONTO THE ALLEY AND CALIFORNIA STREET. THE CITY <br />STREET AND ALLEY DIRECTED THIS STORM WATER INTO THE <br />EXCAVATION WHICH INCREASED THE COST 8Y (1) $6,000; <br />(2) $200; (3) $1,500; AND (4) $550 PER THE ENCLOSED <br />BREAKDOWN BY DEVCON INC. <br />THI� PROBLEM WAS NOT PREDiCTED IN THE DESIGN OR BY <br />THE CONTRACTOR IN HIS BID. THE OWNER (SECOND BAPTIST <br />CHURCH) HAS NOT CONTRIBUTED TO THE EXTRA COST. <br />WE ARE ASKING THE CITY FOR RECOVERY OF THESE COSTS <br />CAUSED EXCLUSIVELY DUE TO OFF SITE STORM WATER BEING <br />DIRECTED BY CITY STREETS INTO OUR EXCAVATION. <br />PLEASE ADVISE US OF ANY FURTHER ACTION REQUIRED TO <br />COMPLETE THIS RECOVERY. <br />YOURS, <br />�� �W � <br />ROBERT W. CHAMPION I.A. <br />' DEC J ( <<�_ <br />. CIIY <br />_ ........ ................ <br />01= El'Ef,�T7'...... <br />�-uLlic 1'iql;s D�_Pi. <br />Robert W. Champion, <br />3°�02 CCL'�- 4,:erae. Everett. AY� cB�01 <br />Architect A.I.A. <br />(206� 2�9�3136 <br />