0 <br />EFFEC7 <br />la1 <br />SECOND 6AP7I57 CNURCN <br />Delayed start due to PUD easement - Change of conditions <br />��) Start August 28th. Delays for acquiring easements and <br />oWer poles. <br />moving P <br />October 6th. Finished moving power poles and lines <br />October 11th• Remobilize track hoe <br />(�) Schedule pushed back 46 days, putting us into worse <br />weather. of Supervision. 1,000 � <br />�2) General condition cost consisting mostly --^ <br />Heavy Rains - Change of conditions. <br />Start diggi�9 basement and water from California street <br />and adjoining up hill areas poured into our excavation <br />as we are trying to dig it. <br />Excavatton takes twice as long to dig because of soupy <br />dirt. hill <br />Laid french drains to intercept water from up <br />All dirt (now mud) must be hauled off site as it is <br />too wet to use as backfill. Filled bottom Willxbe drain <br />with 12" of crushed rock. �11 backfilling <br />rock • ht g day <br />(1) <br />EFFECT: � » <br />(2) <br />(3) <br />J" ' <br />�q) Pumped excavatium sowillube added <br />�51 Two each sump P p erimeter is needed <br />(6) Extra drain around P �_ General Condition <br />(7) Delayed project 1 week line between <br />(g) Extra french drain along East property <br />G rd duilding <br />(C) <br />EFFECT: <br />6,O�OOy <br />200 <br />1,� <br />� <br />1,600 <br />200 <br />---� 1 , 000 <br />1,000 <br />Church and National �a storm and _ <br />(9) Tie upper Perimeter drain into existing � N/C <br />sanitary line on Virginia Street. <br />Masonry - Change of Conditions <br />(�) As we could not backfiil, we had to build staging <br />for Mason to base hi scaf+old onto. <br />��) Cost for labor and material <br />Material: . 506 <br />Labor: � <br />�� <br />� 13,806 <br />� <br />L <br />