Laserfiche WebLink
COMPLIANCE <br />REQUIRED <br />INSPECTION <br />APPROVED� IMPORTANT: Please supply Information In the shaded boxes and checl. the appropriate <br />circles. Disregard topics that don't describe your building or equipment. DO NOT place <br />checks In the two left columns. <br />011M <br />III <br />wall Insulation is installed and equivalent to the required wall R-values above. <br />I I WSEC Insulation phase requirements: <br />I l Inspected by: Date <br />Kw <br />BTUIH <br />❑ ❑ gCrawl space Floors shall be insulated without compression, and with supports 24" O.C. to: R- <br />❑ ❑ Q Non -vaulted, attic Ceilings shall be Insulated without compression to: R- <br />❑ ❑ ®Door systems shall meet: U- See Calculations <br />s Door types are (t)' -(z) (3) <br />Page 7 <br />