Laserfiche WebLink
Mr. Dennis Gableman <br />Pace 2 <br />April 14, 1983 <br />alleys to input both sanitary wastes from the Work Release Facility and runoff <br />from the expanded parking lot into the eight -inch east -west sewer. <br />Construction of the sewer connection for the Work Release Facility under the Jail <br />contract will permit coordination of trenching; grading; manhole installation and <br />line connections; paving; and the installation of other underground utilities and <br />facilities. Construction of the sewer connection now would necessitate new <br />connections, new earthwork, paving, etc., when the Jail site work is undertaken. <br />We anticipate that the State will make funds available for construction of the <br />Jail within the next several weeks; additionally, we expect that the Work Release <br />Facility population will be substantially below its design capacity for several <br />months. Or these bases, we propose to operate the Work Release Facility with <br />its present sewer services until such time as orderly revisions can be made under <br />the Jail contract. We offer the stipulation, however, that we would proceed with <br />an independent connection to the eight -inch main if State funding of the Jail <br />has not been confirmed by Septembe,• 1st. <br />I would be pleased to meet with you if you have any questions on the matter. <br />Your continuing cooperation is greatly appreciated. <br />Very truly yours, <br />'ER C ARK, Manaaer <br />Jail onstruction Project <br />r <br />JLC:jt <br />cc: Larry Callahan <br />