Laserfiche WebLink
EVERETT WATER DEPARTITENT <br />3200 CEDAR STREET <br />EVERETT, WASHINGTON <br />COST ESTIMATE SHEET <br />TYPE OF INSTALLATION Fire service <br />LOCATION New Jail on ball Street <br />REQUESTED BY Paul Glentz <br />DATE OF REQUEST 8-22-83 <br />SIZE 10" <br />ESTIMATED COST $11,184.09 <br />Mhenever the estimated cost is not sufficient to cover the total <br />expense for labor, materials, equipment rental and ads izistranon, <br />the deficit shall be charged to the property for ivhich such installa- <br />tion was made and the owner thereof, and provided further, that any <br />excess payment shall be returned to the person applying for the in- <br />stallation.) <br />ESTLMATED COST ITE',IIZED AS FOLLOIPS: <br />Labor 1506.23 <br />Material 7716.38 <br />Equipment rental 588.00 <br />Administration and supervision 1373.48 <br />Total estimated cost of project $11184.09 <br />l <br />Don Wahl, Supervisor III <br />is <br />cc: Bud Krom <br />Don :lei tkamp <br />Larry Callahan <br />Bev Schirman <br />