Laserfiche WebLink
EVERETT WATER DEPART\IENT <br />3200 CEDAR STREET <br />EVERETT, WASHINGTON <br />COST ESTUV ATE SHEET <br />TYPE OF INSTALLATION Domestic service <br />LOCATION <br />REQUESTED 13Y <br />DATE OF REQUEST <br />SIZE <br />EST L.IATED COST <br />: New jail on Wall Street <br />Paul Glantz <br />8-22-83 <br />4" <br />$7544.33 <br />(S4henever the estimated cost is not sufficient to cover the total <br />expense for labor, materials, equipment rental and administration, <br />the deficit shall be charged to the property for whic ; such installa- <br />tion was made and the owner thereof, and provided further, that any <br />excess payment shall be returned to the person applvirg for the in- <br />stallation.) <br />FSTI.JATED COST ITE7IIZED AS FOLLOWS: <br />Labor <br />Material <br />Equipment Rental <br />Administration & supervision <br />Total estimated cost of project <br />is <br />cc: Bud Krom <br />Don Weitkamp <br />Bev Schirman <br />Larry Callahan <br />1506.23 <br />4523.61 <br />588.00 <br />926.49 <br />$7544.33 <br />Don Wahl;. SupeHisbr III <br />