My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1918 WALL ST 2018-01-02 MF Import
>
Address Records
>
WALL ST
>
1918
>
1918 WALL ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 11:40:40 AM
Creation date
3/8/2017 1:26:51 PM
Metadata
Fields
Template:
Address Document
Street Name
WALL ST
Street Number
1918
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
769
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT WATER DEPART\IENT <br />3200 CEDAR STREET <br />EVERETT, WASHINGTON <br />COST ESTUV ATE SHEET <br />TYPE OF INSTALLATION Domestic service <br />LOCATION <br />REQUESTED 13Y <br />DATE OF REQUEST <br />SIZE <br />EST L.IATED COST <br />: New jail on Wall Street <br />Paul Glantz <br />8-22-83 <br />4" <br />$7544.33 <br />(S4henever the estimated cost is not sufficient to cover the total <br />expense for labor, materials, equipment rental and administration, <br />the deficit shall be charged to the property for whic ; such installa- <br />tion was made and the owner thereof, and provided further, that any <br />excess payment shall be returned to the person applvirg for the in- <br />stallation.) <br />FSTI.JATED COST ITE7IIZED AS FOLLOWS: <br />Labor <br />Material <br />Equipment Rental <br />Administration & supervision <br />Total estimated cost of project <br />is <br />cc: Bud Krom <br />Don Weitkamp <br />Bev Schirman <br />Larry Callahan <br />1506.23 <br />4523.61 <br />588.00 <br />926.49 <br />$7544.33 <br />Don Wahl;. SupeHisbr III <br />
The URL can be used to link to this page
Your browser does not support the video tag.