Plan Check No. 1328 <br />Byron Backstrom <br />August 24, 1983 <br />Page Nine <br />9. Security grillage at the roof: <br />a. A complete design and details should be furnished for the grillage <br />support and connections. <br />b. Grillage does not comply as a required 2 hour fire resistive roof and <br />fire retardant system. Table 17-A <br />10. The 4 1/2" slab on level S1 will not provide a 3 hour fire resistive occupancy <br />separation between the B-1 parking below and the I-3 above. Table 5B, Footnote 1 <br />11. The foundation for all buildings where surface of the ground slopes more than <br />1:10 should be level or should be stepped, so that both top and bottom of such <br />foundation are level. Section 2907(c). See Details on Sheet S2.2 <br />12. The flexural wall boundary steel anchorage into the foundation should be clar- <br />ified. See Sheet S3.1 through S3.6. <br />13. In the determination of building weights in the seismic calculations, the <br />following items apply: <br />a. The weight of all of the concrete shear walls should be included. <br />b. The east -west walls should be included. <br />c. The wall weight of the roof at 7.5' appears light. It should be more <br />closer to 10.51. <br />d. Any penthouse dead load and equipment load such as the cooling tower, <br />should be added. See Calculation Sheet L-1. <br />14. The story shear distribution should include a concentrated load at the top, <br />"Ft" unless calculations are furnished which establish a period of the building of <br />7/10 seconds or less. Section 2312(i) <br />15. At the 5th level, the column rebar tie spacing should be 14", not 16". See <br />Sheet S5.2, Section 2607. <br />16. Calculation Sheet W11C shows shear distribution for seismic loads on all east - <br />west participating walls: <br />a. I cannot seem to find any design analysis on how these values were deter- <br />mined in the submitted calculations. <br />b. I cannot seem to find any similar tabulation in the north -south direction. <br />c. All walls should be included in the distribution analysis. The north and <br />south exterior walls above the second level do not appear to have been in- <br />cluded. <br />