My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1918 WALL ST 2018-01-02 MF Import
>
Address Records
>
WALL ST
>
1918
>
1918 WALL ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 11:40:40 AM
Creation date
3/8/2017 1:26:51 PM
Metadata
Fields
Template:
Address Document
Street Name
WALL ST
Street Number
1918
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
769
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ll U9 Q� c�cj_''(�� ^/ f//�� ��\ <br />Warier McGouOn Font Lyerla. P 5 AtClu1ma and Engmeers West 244 Man Avenue P 0 Bo. 14V Spokane. Washe '.�)o SW.We-awl ' <br />MEMORANDUM <br />TO: The File <br />FROM: Timothy J. White <br />DATE: January 27, 1984 <br />SUBJECT: Meeting Minutes <br />Held January 25, 1984 <br />Snohomish County Det. Facility <br />WMFL Project No. 8105.02 <br />M � � N � T � D'I <br />JAN 3 0 1984 <br />CITY OF EVERETT <br />Inspection Dept. <br />Parties in attendance: <br />Frank Natsuhara, ICBO, Seattle Regional Office <br />Larry Callahan, City of Everett Building Dept. <br />Doug Budden, " " " 11 <br />Jack Fretz, " <br />John Plimley, WMFL <br />Tim White, WMFL <br />The purpose of the meeting was to discuss the remaining items to be <br />resolved from the ICBO review dated August 24, 1983 and reach a con- <br />sensus agreement regarding those items. Structural items were discussed <br />first because the resolution was considered most critical. Architec- <br />tural and mechanical discussion followed. <br />STRUCTURAL <br />Item r5: WMFL and HNTB will review shop drawings of mechanical equip- <br />ment anchorage for appropriate seismic structural design. if <br />the anchors are shown to be insufficient, WMFL will send a <br />copy of the corrected shop drawings to ICBO and the Everett <br />Building Department for review. <br />Item rib: Slab reinforcement OK as designed. <br />Item n13: Okay <br />Item .414: Okay. Calculations establish a period of the building of .57. <br />Item N17: (a,b,c,e) Revised calculations and suggested solutions were <br />presented to ICBO and the Everett Building Department. <br />Preliminary approval was indicated pending review of calcu- <br />lations by Frank Natsuhara. WMFL reminded Frank that the time <br />Bruce M Warier, FAIA Jean W MCGeugn. FAIA Warier W F014. AIA Jack M Lyena. PE Gordon E Ruenl. AIA Geroge H NAcnianeen, AIA <br />G.18W P Adkma. AIA Anhui A dlmg, CS' <br />
The URL can be used to link to this page
Your browser does not support the video tag.