Laserfiche WebLink
On -site detention will not be required. In lieu of on -site detention, payment <br />will be made to the Regional Detention Fund No. 340. The amount required <br />will be based on drainage calculations as required by the Public Works <br />Department when design and development plans are finalized. <br />The existing north -south alley must be maintained by easement or within the <br />existing alley right-of-way and will have to be vertically realigned to handle <br />increased traffic from this development. (15% slope maximum.) The existing <br />grade differential at Wall Street is excessive from a traffic safety view. <br />6. Existing sidewalk around the perimeter of development on the block must be <br />brought up to standards, which will require replacement of all broken or <br />depressed sections. <br />-3- <br />