Laserfiche WebLink
CONTRAC?vR' S � <br /> ���� ��; <br /> � <br /> -W��: Terre Petersen 2aae A oE � <br /> =co,�c �ddress: 1527 Rucker Avenue 'rolepnonez52-9662 (h) <br /> � � ro <br /> � y 1. G7�R11Q. FtEPAI32.4 <br /> � y N Hold the existing garage walls and i of in place with tertQorary post and <br /> y � N beam support to the building. CVt the base of the outside walls up at <br /> K y � least 8' above the rnncrete floor slab. Drill t��e thickened floor slab, <br /> b y � undec the walls, install st.eel pins every 6' 0', or less, starting at <br /> � � the wall ends. Install two pins minim�nn where wall lengths are less <br /> ro <br /> � than 6' 0•. Form for 8' hic,� 6' thick cucb walls around the building <br /> and set a !4 steel reinforcing bar horizontally in center of new cucb <br /> H � R walls running bar continuously around the building. Pour concrete curb <br /> H • � walls. Set 1/2' steel anchor bolts in new curb walls on 4' 0' centers i <br /> � y � with a minimum of two bolts in each wall. Place a 2' x 4' pressuce <br /> � H y treated sill plate on top of new cucb walls, bolting to the foundation, ; <br /> $ y and fasten building wall studs to new plates. Complete the exte dor ', <br /> n � '^ siding finishing below the top of the rew oonccete walls arrl keeping all ' <br /> �, �° r wood at least 6' above the exterioc ground and �ncrete surfaces. <br /> ro <br /> y � y Remove the rotted siding boazd fcom the east wall and fill back in to <br /> match. <br /> Straighten up (plimib) the 9acage walls and spike on 2' x 4' diagonal <br /> bcacing, running top to bottom plate, two braces at each rnrner oE the <br /> building. Make the walk-in door on the west side operatior�al after the <br /> building is strai�tened. <br /> Stcip the coof down to the tafters. Rena�ve all the fcaming (2' x 6' and <br /> 2• x 4•) fcan between the 2• x 6• rafters and spike on a 2' x 6' H.F. N2 <br /> ledger along the top of the west ard east walls placing them at the <br /> location to suppoct new 2' x 8' raftecs arcl still have the tops of the <br /> new tafters line up with the existing 2' x 6' rafters. Ir�stall new 2' x <br /> i,—� g• p,F, #2 rafters at 16' centers cesting the rafter ends on the new <br /> L� ledgers ard running beyond where possible. Leave the existing rafte�s <br /> and [oof overhargs es is, fascia boa�ds and all. Nail 1/2' CDX plywood <br /> � sheathin9 to the new rafters and the end �afters, rating that the old <br /> � '�� raftera dip bela+ the new. Install black to[di-down roofing to the new <br /> �� sheathinq� Jenstar Roofing or equal. <br /> �t badc the rafte� overhang on the west side of the garage leaving <br /> enough rafter to support one row of existing Eibe�glass rooE paneling. <br /> � r� Straic�ten up all sagging rafters adding naili.ng. Add proper suppo�ts <br /> fo[ the panelling. <br /> Remove the 9' 0' x 7' 0• garage door and acwnpanying hardware. Install <br /> �� a flush panel plywood overhead garage door along with track and other <br /> hacdware. Door to have a keyed lock. Owner to paint out new door'. <br /> Contractor is cesponsible to do whatever nece>sary framing it takes to <br /> install new door. <br /> �1 _'�" All work called out in this item to be performed in oo�liance with the <br /> requirements of the Uniform Building Code, 1988 edition. <br /> ���I 1 s <br /> z. c�x ra+� u� sAm x��s <br /> �. Hold the porch [oof and walls above the floor in place and <br /> remove e Elooring down to the floor joists belor+. Remove the <br /> �emaining rotted tim joist and 4' x 4" suppoct beam fcan underneath at <br /> the east end of the pordi. Scab on tceated 2' x 6' joists whe�e <br /> existing joist ends are rotted, Add treated 2• x 6' rim joist and <br /> treated 4' x 4' suppoct beam across the east end. Build up the subfloor <br /> with 3/4• materials and nail 1' x 4' clear fir 'I5G (vertical gcain) <br /> flooting on top, Einishing at the Level of the old flooring. Run the <br /> Elooring boards east and west. <br />