Laserfiche WebLink
�0� 1'RACT� R ' S <br /> �� �� <br /> ,,,��; Terre Petersen �a� � u� � <br /> � � =ro7�c ,,ddress: 1527 Rucker Avenue ?2lephone252-9662 (h) <br /> � <br /> a c <br /> � H V+ <br /> g Rear stai[s. Remove the stairs cot�lete. Build back Ghe stairs out oE <br /> y S � all treated wuod making the new stair as wide as the existing staic. <br /> K y � Make the treads out of double 2' x 6's, giving approximate 11• of tread <br /> � y H depth. Stair rise to not exceed 7-1/2• with clos=_d in risecs. Leave <br /> _ � sides of new stair open making su[e the east end of the porch is closed <br /> � � in with matching materials. Add a scceened foundation vent to the east <br /> � end. euild a treated foundation vent to the east end. Build a treated <br /> � � cailing on each side of the new steps, making secure by fastening both <br /> z „ � sides to the po�� walls above. Install a 4' x 4• post on each side of <br /> � y z stair at the bottan, bolt to stairs. Railings to meet the Wilding code. <br /> N y <br /> � d y All work called out in this item to be pe[formed in eo�liance with the <br /> � � � requirertw_nts of the Unifocm Building Code, 1986 edition. <br /> ON E <br /> 3. PI.OlBIl�G <br /> gaearst. Replace all galvanized water lines with type 'M' copper, <br /> notiTng there a�e a few sho[t sections of galvanized with mostly coppec <br /> or plastic lines already in existence. Add water shut-offs to the <br /> clothes washer. Pcoperly suppo[t the existing plastic lines with <br /> fasteners to the floo� joists above. Plimib in a chrome faucet in the <br /> laurdcy tub. Replace the hot watec tank with a new electcic 52 gallon <br /> H.W.T., Reliance ene[gy efficient tank oc equal. Tank to have double <br /> 4000 watt elements. Set tanlc on a foam ir�ulating pad. Tank to have a <br /> , five-year warranty. Contractor to p�ovide warranty to the owner• <br /> I �� gathco�, Remove the tub and sucround complete. Plumb ir. a new ahite <br /> 1 erw�i steel tub conplete with bath and shower dual crontrol Eaucets, tw <br /> valvea with divecter ard shower head kit complete, Moer. Chateau or <br /> �'� equal, New wellboard arcl sutmurd aze going in at the tub in arother <br /> ��� spec item. Plumb in new self-rimning white steel 20' x 17' bathcoan <br /> sink ard t�ardle faucet, Moen (hateau o[ equal, in the new cabinet <br /> catntertop. Note vanity is being replaced in another spec iten. Also, <br /> new wallboacd wi11 be installed on the bathroan nocth ard east walls. <br /> ' �••� Ranoye the toilet and plumb in a new white china toilet at the same <br /> � location. �fie east wall fucring will be eemoved badc to the original to <br /> give proper cleazances foc the toilet on the east side. 'riiis work is <br /> called o�t in amther spec item. Reinstall the toilet paper holder. <br /> +� Note, also that the kitchen ceiling under the bathroan will be stripped <br /> ard sheetrocked. <br /> + All pl�mibing work to be pecformed in oortgliance with the cequirements of <br /> 1 ���.. the Uniform Plumbing code, 1988 edition. <br /> � S <br /> ��.�� 4. ffi�CIRIGL <br /> Garsqe. Remove all garage wiringr both ir�side and out. Place metal <br /> covers on the notth wall plug ard switdi outlets. Rewi�e both <br /> receptacles to � at tlie center of the ga[age west wall (one inside <br /> and one outdoor ceceptacle). Wire in a double spot lic�t on the garage <br /> west wall ard single spot on the south wall, both fixtures to have <br /> motion detectucs. Wire in new ceiling lic�t Eor the garage intedo�. <br /> All new lights to be connected to switd�es. <br /> Bathro�. Wice in a 1500 watt fan-forcxd electric wall heater, King <br /> squTel cage o[ equal, with heater mounted thermoetat. Wire in a new <br /> wall li�t fixture over the bathroan sink and connect to a new wall <br /> switch, placing switch on same wall as light. Note, the north and east <br /> walls will be sheetrocked in another spec item. Provide oaner with a <br /> light allowance of S50 for new bathroan light. <br />