Laserfiche WebLink
. <br /> ( ( . <br /> ..�,�L�s <br /> 1997 WSEC�Res en a � a g,_ t <br /> ':�-vY` - �":;.�s�:.�.:-:•a=� <br /> ' �J R.:.��,. . .�.,'t:..�� <br /> Instructions: <br /> A. The folldwing steps will detertnine the maximum heating aystem aize: <br /> 1. Structural loss, value (1): May be taken directly from the Proposed UA box on Page 2. <br /> 2. Air leakage loss, Value(2):This is the volume(Ft')of the conditioned space in the dweiling. <br /> 3. Duct Loss, value (3): Insert value from BTU/HR, Box(a).Climate Factor, <br /> 4. �T: The local ASHRAE climate factor is °F foryourjurisdiction <br /> To determine AT: (dT=the temperature dilference behveen Outdoordesign temperature and <br /> IndoorDesign Temperature). The heating or cooling Outdoor Design Temperatures shall be <br /> selected from 0.6%column for winter and 0.5%column for summer from the Puget Sound <br /> Chapter of ASHRAE publication'Recommended Outdoor Design Temperatures,Washington <br /> State, ASHRAE.). Indoor Design Temperature shall be 70 °F for heating and 7B°F for cooling. <br /> Example: For Elma,WA:Wint�r • <br /> Indoor Dnipn T�mp�ratun ■70°F <br /> Outdoor Daign T�mp�ratun ■24'F <br /> ...so... (70'F►{24•F)■�8 eT <br /> 5. Calculate values a, b, and c by multiptying the�umbers in each horizontal row. <br /> 6. Add values a, b, and c. <br /> 7. Multiply the sum from Step�16 by 2.0 to obtain the maximum headng system output for the building. <br /> B. If the heatlng system is electric,divide fhe BTUIhr.value from Step*7 by 3413 to get kWatt output <br /> S�Hye�at loss path ,Valw :�T.' ` yp <br /> W�6 b�.ii� 'i�aY. . ...�yY. 2 <br /> Structuralloss (1) (BTUMr/F) x ' (�) <br /> Airleakageloss (2) (R3) x x .80 x 0.018 ■ (b) <br /> Duct losses (3) (BTU/Hr/F) " z .20 ■ (c) <br /> .,�,--�R,}�lo.� � -� � i.`-�'i.:<rl: <br /> �• �,�.�;.c,�''+ .:, .� ....i. <br /> .�s`r�.:;+.. � ee�.-::! <br /> ="*►'�� D�afyn Hwt Lo�d(D.H.L) � <br /> " itG::s� ` (�+b*c) <br /> sa=;:;...:�� (BTU/Hr) <br /> �?r.�a.�l�na.�*.��M <br /> se++w+wrc <br /> r� a...t_.,�p•�,.,J�i, . <br /> J�� '�.'•`,-''���:�:t:..: <br /> . zr,.,,��..=� : _: :;>.�e.-, M�xlmumHwdnpOutput <br /> n r.r•�. . .,.� s:.�l.� (Gas,oll,ProWn�� woadl <br /> pi otsysi«n+►.=� . .,� . �° (D�slpn Hat/oad x 2.0) 9 <br /> •°'" +� �'+*,. •�.+ (BTUlAr) <br /> a ng O ,�;� � �� <br /> :� �si' <br /> �. <br /> r �,,�,,.;,BtwH;raF� '4:r�' OR <br /> _SNotu:e':.- . . .,. ... i � <br /> � �. Max/mum HwNny Output <br /> ^ � .. �_-w � r� (El�cblC,hNt pUmps) � <br /> , ,�, ., � .�,,.:�.oE�. (D. H.L X 2.0=3N3) (kWatb) <br /> � .�.3 ;: . , ... .- '`''ti �,� <br /> � � w.,.�.K�.. <br /> ��9 <br />