Laserfiche WebLink
, ��vo2ic cop y <br /> • '. ;. <br /> - , . <br /> .;;�: G <br /> �'�' �i <br /> REPAIR SPECIcIC�,:I0i15 A;1D LiST OF WORK TO BE EiD <br /> r-� <br /> ;ddress: .-� �-� � �C(C' '1P1' Paqe � �� <br /> Gencral Conditions: The contract for the following work will have to be <br /> signed by the contractor before April 15, 1989, and the wo�k shall be <br /> completed within 60 consecutive days after the signing. Unit ¥1 will be <br /> vacant du�ing this time peciod• 'Ihe owner will be painting the building <br /> extecior and also the i.nterior areas whe�e the "called out" work is taking <br /> place. Contractor is expected to coocdinate the interioc painting with the <br /> owner. Also, the owner will install unit ql kitchen cabinets and sink. <br /> 1, Demolition & Ebundation Repairs Dertalition and Eoundation repairs <br /> in unit M1 bathcoom and storage area behind. Remove the bathroom <br /> plumbing and electrical fixtures, cutting off exposed plimibing lines <br /> and capping as necessacy. �ar out the bathroom north and east walls, , <br /> including 3ny built-in cabinetry. 'Ipar out the batlitoom and storage irx �y� ' <br /> (behind bathroom) room floors, including the concrete .pads, down to the P`— <br /> ground below. Fbllowing the removal of the floor and concrete, the <br /> contractor shall rertbve the mount of dirt in the crawl, lowering the <br /> dict to at least 18" below the bottan of the floor joists and 12" below <br /> the supporting beams• Reframe the entire floor in the bathroom-stocage <br /> area with new hem-fir joists on 16" centers sized to code. Cover the <br /> new joists with 3/4" T5G plywood crombination flooring. Remove all the <br /> overhead hot wat2r heat piping including the water tank. 'Ihis new room <br /> is to be a bedroom. Strip all walls down to the studs. <br /> Demolition and foundation repairs in unit Ml kitchen and rear storage <br /> (east' of kitchen) . Remove the kitchen cabinets complete and plumbing <br /> a.x3 electric fixtures. 'Pear out the kitchen and storage room wood <br /> floocs complete, leaviny the existing rnncrete floor slab in the large <br /> stocage area in the northeast corner of the building. euild up the <br /> gcound area to level under the rear storage and tpourlevel4nof�the <br /> (minimian) conccete slab over this area matching <br /> existing concrete floor slab. 'IUrn the slab across the west end and <br /> run a short (approx. 24" -• 30" high) 6" thick retaining wall down to <br /> the bottom of the crawl under the existing kitchen acea. 'fiicken the <br /> bottom of the new retaining wall to provide a footing. Run #4 steel <br /> rebar at 24" O.C. each way in the new slab and continue into the <br /> retaining wall and Eooting to ccde. Steel is to tie the retaining wall <br /> and floor slab together. Keep the new steel up at least 1-1/2 �er <br /> �� <br /> the dirt. Retnove the dirt from <br /> the existing kitchen aeea to at least 18" below the bottoms of the <br /> floor joists ai�d 12" below the supporting, ��'on 16'�centers and <br /> kitchen (converted to bathroom, floor with � sub-flooring and top <br /> sized to code. Cover the joists with 5/8" � <br /> off 1/2 plywood underlayment. 'Itie kitc,._.� now becomes the new <br /> bathroom., Finish the new bathroom walls W Dleas �i��c item #4ew <br /> floor. Note these walls to be covered with g. <br /> Dining and living room floor repairs. Rernove the rotte�3 flooring and <br /> sub-flooring and build back �p to existing tloor level. �lote holes <br /> have been made to observe some oE the rot from the top side. Floor <br /> • coverings to be :nstalled later. <br /> General foundation repairs. Inwer and level all dirt in the entire <br /> FOUNf)Q%«1,J building crawl space to at least 13" below the bottoms of the floor <br /> joists and at least 12" below the supporting beams• Replace all rotted <br /> ���� __�s and bua infested foundation support beams and floor joists (if any, in <br /> addition to tlie floor joists being replaced in the previous paragraphs) <br /> to code. Replace the sill beam across the front retaining wall with <br /> treateo sill and close in to match. Note, there are areain tthe adirte <br /> Eront of the building, Where the beams are resit on. Repost a11 <br /> Reinstall the flat 4 x 6' �� n an upright po — <br /> I <br />