Laserfiche WebLink
_. �. <br /> . � . ,, <br /> ' ^� fl� . <br /> . J. <br /> / <br /> REPAIR SiECIFIC:yTI0t:5 r1i7D LIST OF WORK T.0 BE HID <br /> i <br /> r �'J <br /> � � /� <br /> .,ddress : �—� � '�1r� }~l � �f'1� ,�)/r— �age , �r � <br /> f <br /> Unit #2. Remove the windows Erom the south wall of the sun room, <br /> insulate, and close in both sides with materials to match. Make ready <br /> for owner to paint. Cut in two openings in wall be'ween the living i <br /> room and the bedroom and install two wood louvered vents (18" x 12" �r I <br /> largec) . Trim out complete. � <br /> Unit p2 entry door. Rertbve the entry door ahd install a new 3' 0" <br /> p�ehung six panel steel dooc complete with trim to match. tbor to have <br /> a new entry lock set and single cylinder dead bclt, Schlage er equal, <br /> keyed alike. <br /> Unit #4. Reinstall existing raiiings down one side of the entry <br /> stairway. Lnosen the window in the east bathroom, making operable. <br /> All work in this item to be performed in compliance with the <br /> requirements of the Uniform Building Code, 1985 edition. <br /> $ <br /> 8. Floorin Vinyl. Install 1/2" particle board underlayment over unit <br /> �1 kitchen floor (note new kitchen location) and 1/2" plywood <br /> underlayment ovec unit #1 bathroom (new location) floor and the <br /> building rear entry hallway flooc. Prep all new underlayment and glue <br /> down new vinyl covering, Mannington Vega #3182 (Astoria) or eaual. �;,q <br /> Strip the vinyl off unit #4 rear bathroom floor and prep. Glue down <br /> the same vin�°1 as used in unit pl. Finish off all new vinyl work with Q YO <br /> new prefinished wood base and also metal moldings as needed. <br /> Carpet in unit #1. Prep the floors in the two new bedrooms (closets <br /> included) , n�aw hallway to the bedrooms and the bathroom, living room, <br /> and sun romn. Install new carpet, Galaxy style #355 (F�rbor Place) ��y� <br /> coloc NNC)7 (DeeP Cameo) or equal, over 1/2" rebond pad to these same <br /> floor areas. Install moldings as necessary to complete. L y� <br /> $ <br /> Altecnates: (Please include the tax in each item amount. Do not include the <br /> price oE the items below in the total bid amount.) <br /> 1. Delete the ccncrete stairway (southeast corner of the building) as <br /> called out in item #2 of the spec. Place the stair concrete landings <br /> as called out and build the stairr�ay with treated 4" x 12" beams <br /> running down each side and bolting preforme�3 concrete treads to the new <br /> beams. Set treads to give rise and run to code. Install railings as <br /> called out in item #2 of the spec. <br /> DEIX1Cf $ <br /> or <br /> , ADD $ <br /> Z, Add the following window repairs: Remove unit #2 sun room (porch) and <br /> kir_chen window glass and wood sash from the west wall and install <br /> insulated mil finish units back into the openings. 'iwo of the new <br /> units shall be opening ceplacement units while the remaining windows <br /> can be fixed raw units Rertave unit #1 sun room (porch) windaa glass <br /> and wood sash from th�� west and south walls and install units to match <br /> unit #2 new units. Provide two units as o�eners while thq remaining <br /> windows can be fixed raw units. Note, the new opening windows in this <br /> unit shall be able to latch when part way open for safety reasons. All <br /> opening windows shall have screens. <br /> ADD $ <br />