My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2522 RUCKER AVE 2018-01-01 MF Import
>
Address Records
>
RUCKER AVE
>
2522
>
2522 RUCKER AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:57:37 AM
Creation date
3/8/2017 9:01:48 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2522
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. j <br /> You may appeal a final determination to the City Clerk at City Hall, 3002 Wetmorc Avenue no later than 14 <br /> calendar days from the date the MDNS becomes final by subm�tting a written statement requestin�an appeal <br /> which sets forth the name and address of the person aggneved, an explanation of why the person is aggneved, <br /> a clear and concise statement of the specific issues for the appeal on a form provided by the Planning <br /> Department, and a fee. You should be prepared to make specific factual ob�ections. Anpeal application <br /> packets are available from the Department of PlanoinpJCommunity Development at 2930 Wetmore Avenue, <br /> Suite 100. ' <br /> Contact Gary Doughty to read or ask about the procedures for SEPA appeals. <br /> N07'E: A DNS may be withdrawn in the event of significant chsn�es in the proposal, disclosure of <br /> new si nificant information, misrepresentation by the aPp6cant, or failure ro comply with the J _ __ <br /> con mons upon w icfi"tliis I3etermmation of Non-Sigmficance is�retlicated.- - - <br /> INFORMATION FOR DEVELOPER: � <br /> The following information is Qrovided for the developer's benefit. These are not SEPA conditions. All � <br /> requirements are preliminary m nature, and are based upon the preliminary site plan and the ordinances in <br /> effect at time of submittal for SEPA review. The proposal must comply with all ordinAnca in elTect�d <br /> the time a complete building permit npplication is filed, including those noi specificall� Yet forth <br /> herein. (Exception: For vesting under the Zoning Code, please refer to Section 44 of the Zoning Code). <br /> Contact the Planning Department for information regarding appeals processes for the requirements listed m <br /> this document. <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with Ciry Design <br /> and Construction Standards shall be submitted to the Public Works Department showing site parking <br /> layout, landscaping, utilities, storm drainage, temporary construction erosion control, and all required <br /> improvements m the public right-of-way. Public Works Department approval of these drawings is � <br /> required prior to any permits being issued. All improvements shall be completed, approved, and <br /> warranted before Occupancy permrts are issued.' <br /> 2. This project must comply with the current City of Everett Building Code and Sprinkler Ordinance. <br /> 3. A demolition permit for the existing houses must be obtained form the City Building Department. <br /> 4. A grinder pump will be required for side sewer connections to the public sewer system for the sewage <br /> from any finished floor with an elevation less than the rim elevation of the sewer system's nearest <br /> upstream manhole. Connections to the sewer system for upper floors should be independent of the <br /> grinder pump. <br /> 5. The sewer connection for thi� building must be via a new manhole installed over the existing 8 inch <br /> sewer main. <br /> 6. Special charges for connection to the sewer and water systems in accordance with Ordinance 1998-94 <br /> and subsequent revisions are applicable. These charges are based on projected water usage and can be <br /> substantial. The Applicant is encouraged to obtain a copy of the ordinance and determine estimated <br /> charges prior to building permit application. The actual charges shall be computed by the Public <br /> Works Department per the ordinance in effect at the time of building permit issuance. <br /> 7. On site detention of stormwater runoff is required in accordance with City standards, if calculations <br /> show the an e�ccess of 250 cubic feet of rainfall storage will be required. <br /> 8. City Streets are to be kept clear of dirt and debris at all times during the construction. Dust <br /> suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 3 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.