Laserfiche WebLink
30.Calculadons should be provided which show the required amount of attic ventilation <br /> has been provided. "Bird Blocking" (detail 6/S-16)will require addidonal vendlation <br /> such as ridge or gable end vents. Requi�ed 1/4 inch co�rosion resistant metal mesh <br /> shall be specified. Note that the mesh will reduce the efficiency to 75% of the gross <br /> opening. Attic ventiladon may not be taken from areas whe�s opening protecdon is <br /> required. All venting locadons should be shown on the roof plans. <br /> 31.Main tunners, cross furring, and hangers should be specified on the plans and shown <br /> to be in conformance with Table 25-A for the suspended ceiling shown in the ezercise <br /> room. Section 25Q4A <br /> 32. Details should be submitted for lateral bracing with compression swts for the <br /> suspended ceiling. UBC Standard 25-2,Table 25-A,Footnote 1. <br /> 33. It should be shown on the plans that a listed smoke detector be placed near the <br /> elevator entrances that upon activation will prohibit the elevator from opening and <br /> �etum it to the main floor. See other requiremen�s per Section 3003.2 <br /> 34. Elevator hoistways should be vented per the requirements of Section 3004. <br /> 35.Elevator machinery rooms should be vented per the requirements of Sectlon 3005 <br /> 36. Elevators are regulated by the Washington State Department of Labor and Industries. <br /> It is suggested that they be contacted for additional requirements. <br /> Exiting <br /> l. The occupant load of the roof gazden is curtendy calculated at 57 occupants based on <br /> an occupant load factor of 15 per Table 10-A. The siu should be neduced so that the <br /> occupant load is less than 50. Secti�v 1001.6 <br /> 2. Per comments raised previously, all units open into corridors (except unit A). The <br /> entry doors should be shown to be 20 minute assemblies. <br /> 3. It should be no:ed on the plans that all twenty-minute doors in the corridors should <br /> also have smoke and draft control gaskets. Section 1005.8.1 <br /> 4. Emergency exit lighting should be provided in rooms (ezcept dwelling units), stairs <br /> and corridors. An emergency power supply for exit illumination should also be <br /> provided. Section 1012.2 <br /> 5. IIluminated exit signs should be shown at all stairways, exit doors (except dwelling <br /> �mits) and corridors to clearly indicate the direcdon of egress. Section 1013.1 <br /> 6. Battery backup should be provided for the ezit signs. Section 1013.4 <br /> 13 <br />