My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2821 RUCKER AVE 2018-01-02 MF Import
>
Address Records
>
RUCKER AVE
>
2821
>
2821 RUCKER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 12:01:10 PM
Creation date
3/8/2017 9:51:49 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2821
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kenn�dWJ�nks/Chikon <br /> ! aite visit. If it is not anchored, in ths M6.5 �nd M8.25 sc�narioa, it m�y rxk, <br /> � <br /> damapinp connectlnp pipinp. If other damape is minimal, it would take an <br /> satimated 5 days to repair. <br /> Because of its recent desipn, Reservoir Number 6 should have little demaps for any <br /> of the sarthqueks scenarios. <br /> 3.6.2.5 Pumn SteNons. The Casino Pump �tation ahould havs little demsye, a�si� <br /> because of its recent desipn. It is equippsd with en emerysncy p�n�nta. <br /> Batterias, for atartinp its amerpency penerator, shoutd be enchond. Some buiidinp <br /> and equipment damape may occur for the M6.5 and M8.25 scenerios. <br /> The Everpreen Way Pump Station is moderately wlnerable to earthpuake. Desipn <br /> practices in 1966 may not have provided adequate reinforcinp in the infill masonry <br /> to hold it in place. With the shear wall action of the masonry not avafleble, the <br /> atructure could be heavily damaped. If the pump station is heevily demaped, the <br /> ( st►uc!ure could be condemned, and repair work to restore the mechenical and <br /> electrical system not allowed. Further anelysis is suppeste�. Some of tM pump <br /> stetio� electrical equipment was noc adequetely enchored. The pump atetion has <br /> no emergency power. It mey be difficult to pet en emerpency penerator system to <br /> power the 2,400 volt system, because of the voltape, when power is lost. The <br /> pump station is dependent on the reliability of the SCPUD power supply. For the <br /> M6.5 and M8.25 scenerios, there is concem that the pump station would not be <br /> operational. An emerflency replacement may take from two weaks to several <br /> months. <br /> 3.6.2.6 Svstem Oneretio� Estimates. The M7.0 sarthquake scenario would heve <br /> the least effect of the scenarios studied. Water for fire protection will be that <br /> which is stored in the city. Distribution of Mat water may be impacted by line <br /> failures within the city. Operation crews should rospond quickly to shut down <br /> damaped portions of the distributior, system. Reservoiro will drain more quickly <br /> � <br /> 3-53 906014.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.