Laserfiche WebLink
a. size, location, and product stored for each tank. <br />b. Specifications on Tank and Piping Mater-als <br />c. corrosion protection, if applicable <br />d. Piping diagram including fill openings and vent lines <br />and openings <br />e. Detail and Locations of leak detection. <br />N <br />� <br />f. Specifications for any special equipment <br />H <br />16. Portable Fire protection shall be provided within 75 <br />Ha <br />co <br />feet travel distance of all portions of combustible <br />j <br />3 <br />construction during construction. <br />H <br />H <br />o <br />17. A legible and visible address chAl be posted on the <br />o <br />m <br />ri <br />hC <br />building prior to occupancy. <br />VO1 <br />H <br />0 <br />H <br />AND BE IT FINALLY ORDERED that a copy of this written order <br />M <br />be transmitted to the Applicant for their information <br />gdrA <br />v'H <br />Paul A. Roberts, <br />Planning/Community <br />j <br />Development Director <br />CA <br />H <br />O <br />W <br />! ' 1 <br />i <br />U <br />