Laserfiche WebLink
c} <br />Two exits oast also be provided per Table 10-A. A second exit was added io the building <br />to meet the requirements of Table 10-A and Section 1003. <br />6. Please provide calculations per Sec. 2403 for the floor to ceiling glass areas. Provide <br />safety glazing for these areas per Sec. 2406.4. The floor to ceiling glass at the front of the <br />store has been changed to safety glazing. Please see sheets B 1 or B2 for change. Please see <br />attached NREC fors for the calculations. <br />Please indicate insulation R-values and U-factor. Please provide energy calculations or <br />indicate prescriptive path. Please see attached NREC fors. <br />& Please indicate fixture heights for all toilet roen ft ures. All fixture heights are labeled <br />on the restroom details plan. Please see sheet B5. <br />9. An accessible acing area is required. See.1105.4.5. The eating area has been eliminated <br />from the plans therefore an accessible area is not required. Please see sheet B 1. <br />10. Permanent roof access is required. UMC Sec. 321.L An exterior ladder was added to the <br />side of the building for a permanent roof access. Please see sheet B2. <br />11. Please indicate the roof slope. Sec. 1506.1. The roof slope of the building is to be 1 /4 : 12. <br />Please see sheet S2 or S3. <br />12. Please provide interior and exterior lighting power allowance akalatioas. Please see <br />attached lighting calculations. <br />Please note that canopy lighting is = exeopt per footnote 6. Table 15-1. The canopy <br />lighting has been added to the calculations for the site. <br />If you have any other questions, comments, or revisions please notify us as soon as possible. <br />Sincerely, <br />Robert C. Downing <br />Manger <br />jb <br />..,...,.v... "M <br />