My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4128 RUCKER AVE SAFEWAY FUEL STATION 2016-01-01 MF Import
>
Address Records
>
RUCKER AVE
>
4128
>
SAFEWAY FUEL STATION
>
4128 RUCKER AVE SAFEWAY FUEL STATION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2018 8:20:17 AM
Creation date
3/9/2017 12:46:01 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4128
Tenant Name
SAFEWAY FUEL STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Securitv Fence - Any security fence erected around the construction sile shall be <br />located so as to not obstruct any existing hydrant, fire protection equipment, or <br />Fire Department access. If Fire Department access is obstructed, gates or other <br />openings shall be provided for access. <br />4. PREMISE IDENTIFICATION AND ALL REQUIRED FIRE DEPARTMENT <br />ACCESS ROADS AND FIRE HYDRANTS SHALL BE IN SERVICE PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />5. Premise Identification - Premises shall be clearly identified by the correct address <br />at the street entry. Buildings shall be clearly identified so as to be visible and <br />legible from the access road. Individual apartments and suites, where <br />applicable, shall be ;learly and legibly identified from the access road. <br />6. 5ervice Stations - A fire extinguisher with a minimum U.L. rating of 2-A:20-B:C <br />shall be provided and so located that it will not be more than 75 feet from any <br />pump, dispenser or fill-pipe opening. <br />Permits are required from the Fire Department for removal and installation of <br />underground fuel tanks. <br />The contractor shall provide the Fire Marshal with specifications for tanks, piping, <br />dispensers and leak detection equipment, or any other special equipment prior to <br />installation. <br />9. Trash Collection - Dumpsters over 1.5 cubic yards capacity shall be located <br />minimum of 5 feet from the building [IFC 304.3.3, 2003 Edition]. <br />GENERAL INFORMATION <br />Installation of new underground storage tanks must meet the requirements of the <br />new State Underground Storage Tank regulations (173-360 WAC). Copies of <br />these regulations and required forms are available from the Department of Ecology <br />by calling (206) 407-7202, or toll-free in state 1-800-826-7716. <br />2. A notice of intent to install tanks must be filed with the Department of Ecology at <br />least 30 days prior to installation. Within 30 days after coming into service, the <br />tanks must be registered with the Department of Ecology on a stale notification <br />form. <br />3. All firms providing tank installation services must be registered with the <br />Department of Ecology. Tfie supervisor on site during installation must be licensed <br />by passing an exam administered by the International Fire Code Institute or by <br />another state with which Washington has a reciprocity agreement. Within 30 days <br />after coming into service, an installation checklist form i�wst be provided to the <br />Department of Ecology by the company that performed the installation work. <br />��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.