My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
>
Address Records
>
SCENIC DR
>
1707
>
SNO CO PUD
>
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 2:57:05 PM
Creation date
3/9/2017 1:58:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SCENIC DR
Street Number
1707
Tenant Name
SNO CO PUD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,SITEWORR SPECIPICAT: �S �,DWG. N0. 0-4177 <br />BEVERLY PARK SUBSTATIUN 'REY. 0 <br />PACE 2 <br />B. After repair of soft areas, the entire graded surface <br />ehall be conditioned [o a moleture conten[ suitable for <br />compaction and compac[ed to a dense s[ate. <br />C. Subbase flll ma[erial shall be vell-graded granular <br />material, ftee of organic ma[erial and other objec[lon- <br />able matter, and with lese [hsn five (S) percent by veight <br />of that portion of the material finer than 3/4" in elze <br />passing the US #200 sieve. Subbase fill ma[erlal ehall be <br />apptoved by Puget Pover priot to impor[ing or placement. <br />D. All subbase fill ehall be conditioned to a moisture <br />content suitable for compaction and placed in lif[s no[ <br />[o exceed elght (8) inches in loose [hlckness. Each <br />lif[ shall be compacted to 95X of maximum dry density <br />ae determined by ASTM D-1557 (latest) prior to placemen[ <br />of subsequent ovetlying lifts. Sloping ground shall be <br />benched beginning at [he [op of the fill so that the fill <br />is placed in horizontal lifts and keyed to [he ground. <br />Compac[Son equipmen[ shall be operated on the slope as <br />each lift is placed Sn order to insure compac[Son of the <br />exterior of the fill. <br />4. BASE COURSE <br />A. The etation yard (excep[ [he area vithin the SPCC Curb) <br />and drivevays, shall have a nine (9) inch thick base <br />couise. <br />B. Base course material ahall be in accordance vi[h PSP6L <br />Standard Specification 3112.0361, 'Aggrega[e for Base <br />Course". <br />C. The base course shall be compacted to 95X of maximum <br />dry densi[y as determined by ASTM D-1557 (la[es[). <br />Subbase shall be repaired and recompacted befo:e <br />placemen[ of base coutse. <br />D. After ins[alla[ion of founda[ions and other subsurface <br />struc[ures (i.e. ground bus, buried cable and condui[, <br />drainage s[ructures, e[c.), [he surface of [he base <br />course shall be recompacted. Special care shall be <br />taken to :nsure compac[ion of backfill in [renches and <br />around foundations. <br />5. RIPRAP <br />A. Riprap shall be placed in the locations specified on <br />the Drainage Plan, D-7463. Riprap shall be placed <br />Sn such a manner tha[ all telatively large s[ones shall <br />�e in contact vith each a[her and all voids filled vi[h <br />the finer materials so as to provide a aell-graded <br />compacted mass. The riprap shall be placed to a minimum <br />DC-4518.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.