My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
>
Address Records
>
SCENIC DR
>
1707
>
SNO CO PUD
>
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 2:57:05 PM
Creation date
3/9/2017 1:58:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SCENIC DR
Street Number
1707
Tenant Name
SNO CO PUD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Puget Sound Po�,er � Light Co. <br />Special Property Use Permit 16-84 <br />Page -14- <br />5. Full st:andacd street improvements are required to the <br />north nide of Scenic Drive. improvements to include, <br />but not limited to, curb, gutter and sidewalk, plus any <br />drainage� facilities required to channel gutter run-off. <br />These Eull standard street improvements shall be <br />completed at the end of Phase II of the proposed <br />project. They are subject to the performance guarantee <br />condition as set forth in Condition #7. <br />6. :ity streets and alleys are to be kept clear of dirt and <br />dE�bris at all times during construction. Dust <br />suppression and street cleaning must occur as directed <br />by the Public Works Inaoector. Any street cleanina that <br />must be done by the City of Everett as a result of the <br />access of the Applicant will be paid for by the <br />Applicant. <br />7. Performance guarantees are required for street <br />improvements on Sc.enic Drive, including, not not limited <br />to, landscaping. <br />8. A une-year �:.acantee is required on the public <br />impr�vements and site landscaping for an amount net less <br />than 108 of the cost of construction, and shall run for <br />one year from the date of issuance of the first <br />Occupancy Permit for the p�oject. <br />9. A two-year guarantee is required for private <br />retention/detention or other drainage <br />treatment/abatement facilities serving areas larger than <br />one acre. <br />10. As-built:� of storrn sewer will be requiced to be <br />submitted per city design and construction standards and <br />specificat:ens. <br />11. A permit for destinatior� of any Fill materials removad <br />from the site is be required. <br />12. The applicant shall correct any static problems for <br />adjacent residential property owners caused by the <br />substation opecation. <br />13. Puget Powec shall contact the Everett Police Department <br />to aid in the control of the motorbike activity on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.