Laserfiche WebLink
DAMES & MOORE <br />500 MARKET PLACE TOWER, 2025 FIRST AVENUE, SEATTLE. <br />(206) 728-0744 FAX: (206) 448-7994 <br />March 18, 1992 <br />BE&C Engineers <br />P.O. Box 3707, MIS OF-76 <br />Seattle, WA 98124-2207 <br />Attn: Mr. Kurt Eichmeier <br />WASHINGTON 98121 <br />P <br />� '0 <br />Re: Freudenberg Retainpuall ?0tionyy <br />Bidders Summary &QdaJ� <br />G,NF <br />Dear Kurt: 4S <br />We provide herein a summary of bids recieved at our office and our recommendation for the <br />Freudenberg Retaining Wall project. Eight contractors were provided with a bid package including the <br />design drawings, specifications, construction management plan, and contract documents. The <br />following contractors were contacted: <br />American Construction Co. of Everett, Wa. <br />DBM Contractors, Inc. of Fvderal Way, Wa. <br />Dewitt Construction of Portland, Or. <br />Integral Construction Co. of Seattle, Wa. <br />Malcolm Drilling, Inc. of Kent, Wa. <br />Manson Construction Co. of Seattle, Wa. <br />Nicholson Construction Pacific, Inc. <br />Versatile Drilling Contractors, Inc. of Seattle, Wa. <br />The following contractors returned completed bid packages to our office with the associated <br />lump sum bids. The St nedule of Contract Prices and Payments and the Contractor's Bid Letters with <br />the appropriate conditions are attached. The bid packages will be provided for your records. <br />CONTRACTOR <br />Manson Construction <br />Malcolm Drilling <br />Versatile Drilling <br />LUMP SUM BID <br />$ 254,850 <br />$ 289,000 <br />$ 179,490 <br />We recommend awarding the contract to Versatile Drilling Contractors, Inc. with the lowest <br />lump sum bid of $ 179,490. <br />14 ill 11 Y'14U 1 'LL114 <br />