Laserfiche WebLink
DAEs & MOORE <br />2025 FIRS AVENAE. SFATME. WASHZ1GiUV 93121 <br />L00 NG f PLACE TOWER(272s_774=FAX: (206) 448-i994 <br />BE&C Engineers <br />P.O. Box 3707, M/S OF-76 <br />Seattle, WA 98124-2207 <br />Attn; Mr. Kurt 6chmeier <br />March 26, 1992 <br />Re: Freudenberg Retaining Wall <br />Engineering Cost Esdmate <br />Deer Kurt <br />We provide herein our lowest cost estimate of i bids the cocieved t required or the the Freudenberg <br />residence Based <br />jeot a lowest of documented In our letter datectiOl d March 8?1992, we Our estimate hedcost rapt <br />Retain$179,ing <br />5179,490. By utilizing the contractor, Versan'le Drilling, Inc., the Project can be bunt for the above <br />amount. <br />This cost does not include the colt of a performance and paYmert bond which is typically 2% <br />to 2 112% of the contract cost and sales tax at 8.2%. This would bring <br />the total cost to 5199,�63. <br />The costs are itemized in the attached Engineering Cost Estimate. <br />We assume that adjustments to the designed pile ailignment can be made 1n the field to <br />accomodate changed subsurface conditions. <br />Please call the undersigned it there are any further questions. <br />Very truly Yours, <br />DAMES & MOORE <br />' � <br />Joel B. Farrier <br />proiect Manager <br />Pacific Northwest Design Services <br />