Laserfiche WebLink
Mr. Jeff Heilman AUG 10 P001 <br />................... . <br />City of Everett CITY QF EVERETT <br />3200 Cedar Street Permit ✓ ervice# <br />Everett WA 98201 Plan Check No. C0106-027 <br />Mr. Heilman, <br />I have reviewed your comments in your review letter dated July 27, 2001 for the Sievers <br />residence. The following responses are as requested. <br />l . A retaining wall detail is included on drawing A l . 1. The retaining wall is in <br />compliance with section 39.150 in the zoning code. <br />2. The deck has been revised to reflect this comment. See drawings. <br />3. A note has been added to the drawings to reflect the use of R-19 insulation in all <br />below grade walls in conditioned spaces. <br />4. Safety glass has been added to the exterior elevations. SG denotes it on the <br />exterior elevations. <br />5. A note has been added to the exterior elevations denoticg that the brick veneer is <br />to be installed per UBC 1403.6. <br />6 Washington State Ventilation and Air Quality Codes have been added to the <br />plans. See drawing A3.2 <br />7. All of the windows in the house will be replaced. All of the exterior walls on the <br />first floor will get R-19 insulation. The major portion of the exterior walls in the <br />basement will be opened to accommodate the shear wall sheathing, when this <br />occurs they will get new R-19 insulation. The entire roof structure will be new <br />and thus it will receive R-30 insulation. I believe the prescriptive method as <br />shown on drawing A3.1 meets the current Washington State Energy Code since <br />the entire house is being brought up to those standards. <br />8. The U-value of the windows will be as shown in the WSEC table, or Lion IV on <br />14rawing A3.1. <br />9. See the revised attached calculation sheet #4. <br />10. EQ. 30-15 is in reference to buildings with combined systems. We are proposing <br />a single system (shear wall). <br />11. Top plates are to be strapped w/ (2) MST48 straps at each splice. This note was <br />added to drawing A2.2. <br />12. Provide #5 x 1'-6" dowels @16" o.c. This note was added to drawing A2.1. <br />13. Provide #5 x 1'-6" dowels @ 16" o.c. This note was added to drawing A2.1. <br />14. Use GLB 3 1/8 x 10'/z. See sheet 1 of calculations. Drawing A2.3 has also been <br />revised to reflect this. <br />15. The roof loading to the existing headers remains unchanged. <br />16. The footings will be doweled to the wall with #5 x 1'-6" dowels @16" o.c. This <br />note was added to drawing A2.1. <br />17. The structural note on drawing A2.1 has been revise to the correct table 23-II-13-I. <br />18. The GWB at the underside of the storage space has been revised to Type X. The <br />window was eliminated. <br />NN <br />U <br />