My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2909 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
2909
>
2909 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 11:33:30 AM
Creation date
3/9/2017 5:12:49 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
2909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> tStormwater Pollution Prevention Plan <br /> ' ■ Contaminated surfaccs shall bc cicaned immcdiatcly follo«•ing any <br /> dischargc nr spill incident. <br /> � Concrctc and grout: <br /> ■ Proccss �eatcr and slun� rc,ulting from concretc work �ti•ill bc prc��cnted <br /> ' from entering the ��'aters o�'he State by implementing Concrete llandling <br /> measures (i3\4P Cl i 1). <br /> 1 <br /> ' l hc faciliq� is not tr.insportation-rclated and thcrefore suhi«< to thc criteria for dcterminine if❑ <br /> ' Spill Prevcntion, Control, and Countcrmeasurc (SPCC) Plan is required undcr the Pedcral <br /> rcgulations of thc Clcan Water Act (C\l'.Al. <br /> t Thc facilit�� docs not rcyuirc a Spill Prc��cntion. Convol, :tnd Countemicl5urc (SPCC) Plan undcr <br /> the Federal rcgulations of the Clc:in �Vater Act (C�l'A). <br /> ' 3.1.10 F.Icmcnt H10—Contrul Uc��atcrin� <br /> Thcrc ��'ill hc no dc�v�tcring as part of ihis construction project. <br /> 1 <br /> � Altcmatc dc��atcring control f3MPs arc includcd in Appcndi� C as a yuick rcfcrcncc tool for thr <br /> � <br /> onsite inspector in th� c�rnt the i��1P(s) listed abo��e are deemcd ineffecti��c or inappropriate <br /> durine rnnstniction to satisf��thc requirements set forth in thc Gencrai NPDGS Pemiit (Appendi� <br /> ' D). "fo acnid po�ential crosion and scditncnt control issucs that ma}� causc a �iolation(s) of thc <br /> T�PDLS Constn�ction Stanmcatcr pemiit (as pro�idcd in Appcndi� D), thc Ccrtifi�d L'rosion and <br /> ' Sedimcnt Control Lcad �cill promrUy initialc thc impicmcntntion of onr nr morc of thc <br /> alicmati��c 1'MI's listcd in :\ppcndix C :dlcr thc first sign diat c�i�ting 13\11's arc inclTectivc ur <br /> failing. <br /> , �.1.1 I i�.lement #11 — �1:iintain 13�1Ps <br /> ' All tempuran� and pemiancnt crosion ard scdimcnt conirol 13�4Ps shall be maintained ard <br /> repaired as needed to assurc contin:;ed peiformance of thcir intended function. �laintenance and <br /> rep•�ir shall be cunducted in accordvuc wrth cach particulor 13\4P's spccilications. Visual <br /> ' monitoring ol�thc I3�1Ps will bc conductcd at Icast oncc c�ery calcndar �vcck :uid within 24 hour <br /> of am• rainfall c��ent that causes a discharge from the site. If the sile becomes inactive, cmd is <br /> temroraril}� stabilizcd, the inspection frcqucncy will bc reduccd to oncc every month. <br /> ' <br /> ' II <br />
The URL can be used to link to this page
Your browser does not support the video tag.