My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2909 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
2909
>
2909 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 11:33:30 AM
Creation date
3/9/2017 5:12:49 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
2909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' Sformwater Po��ution Prevention Plan <br /> , All tcmporary crosion and sediment control DMYs shall be rcmoved �vithin 30 days after thc <br /> finai site stabiliiation is achicvcd or aficr the temporary BMPs are ne longer needcd. 7�rapped <br /> scdiment shall bc �emovcd or stabilized on site. Diswrbed soil resulting Gom removal of E3MPs <br /> ' or �rgctation shall be perrnanently stabilizcd. <br /> t 3.1.12 Element #12—�lanage thc Prnjcct <br /> Grosion:uid scdimcnt control I3MPs for this project have bcen designed bascd on thc Collowing <br /> 1 principles: <br /> ■ Dcsi¢n thc projcct to fit the caistine topograph��, soils. and drainagc <br /> � patterns. <br /> ■ L'mphasize erosion comrol rather than sediment control. <br /> ' ■ \tinimizc thc cxtcnt and duration of the area eaposed. <br /> � ■ Keep runoff velocities lo�v. <br /> ■ Retain sediment on siic. <br /> ' ■ Thoroughly monitar sitc and m�in�ain all I�SC mcasures. <br /> ' ■ Sdudulc major carih��ork during tlic dry scason. <br /> In addition, project man�gement �+�ill incorpornte the key components listed belo���: <br /> � As this pr�ject site is located �cest of the Cascade \1ountain Crest, the project �tiill be managed <br /> according to lhc follo���ing key prqject componcnis: <br /> , Phasine of Construclion <br /> ' ■ l hc construction prc�jcct is hcing phascd to thc cxtent practicablc in ordcr <br /> to�ueccnt soil erosion, and. to Ihe tnaxitnum eztent possihle, the Uansport <br /> , ot scJimcnt from thc si�c during construclion. <br /> • Rc��egctatian of exposcd arcas and maintenancc of that vegctation shali hc <br /> , an inlcgral pah of thc dc:u ing �ctivitics during cach phasc af conswction, <br /> per thc Schcduling RMP (C 1G2). <br /> ' Sea�eonal \Vork Limitations <br /> � Prom Octobcr 1 iivough April 30, dcaring, grading. and othcr soil <br /> ' disWrbing aclivitics shall only be pcnnitted if sho��ro to the satisfaction of <br /> ' 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.