Laserfiche WebLink
i <br /> � SECTIOh 16105 <br /> , SLECTRICAL SITE MORH <br /> ( E. All backfill material shall be placed so as to obtain a minimum <br /> � degree of compaction of 95 percent of the maximum density at optimum <br /> moisture content. Moisten backfill mnterial as required to obtain <br /> Iproper compaction. <br /> F. Broken pavement, con�rete, sod, roots and debris shall not be used <br /> for backfill. <br /> � <br /> G. fiithin the one qeer guarantee period, re-fill and compact all aettled <br /> ereea to grade. <br /> I3•� WASTE MATERIAL DISPOSA� <br /> Promptly remove from the site and legally dispoae of all materials <br /> I from trenching and ezcavation which are remaining efter backfill end <br /> compacticn. <br /> I 3.09 SURFACE REFINISHINC <br /> A. Refinish every disturbed aurface to its' original condition. <br /> B. Return after one year and refiniah all settled areas to grade. <br /> f <br /> � <br /> END OF SECTION <br /> i <br /> I <br /> I <br /> I <br /> 16t05-3 �� <br /> a3-�1 <br />