Laserfiche WebLink
i <br /> SECTION 1b105 <br /> � ELECTRICAL SITE WORK <br /> I B. Trench bottom shall be free of debris end greded smooth. Where <br /> trench bottom is rock, or rocky, or contains debris larger than 1 ", <br /> or material with sharp edges, Contractor shall over excavate 3�� end <br /> I fill xith 3�� of sand. <br /> C. Separation betveen new electrical utilities and other utilities shall <br /> � be 0'-6" minimwa except gas lines shall be 1 '-0�� both vertical and <br /> horizontel and shall be 3�-��� (horizontal) for all r+ater service <br /> lines. <br /> � D. All crossings of concrete or asPhalt shall be performed only a:ter <br /> �I the surface materinl has been sax cut to required xidth and removed. <br /> I 3•04 EXCAVATIONS <br /> A. Excavations shall be as required for ins�allation intended or as <br /> shoxn. <br /> IE. Excavation bottom shall be free of debris and graded smooth. Khere <br /> � bottom is rock, or rocky, or contains debris larger than 1" , o: <br /> material with sharp edges, Contractor shall over excavate 6" and fill <br /> Ixith 6" sand. <br /> C. Where excavati�•is are for installing utility coapanies vaults, the <br /> I excavation and ��ault installation shall conform to utility <br /> requirements in addition to contract dacument requirements. <br /> � 3.05 DEWATERING <br /> Provide, operate and maintain all pumps or other derratering equipment <br /> require�i for control of water in trenches and excavations fcr <br /> electrical site xork during the entire construc:tion period. <br /> I3.06 SHORINC <br /> Provide as required for trenching and excavatin3 to secure site work. <br /> I j,p� pCKFILL, BEDDING AND COPIPACTION <br /> A. Backfill around raceways per 16170. <br /> I B. Backfill around vaults and handholes to be free af debris larger than <br /> �_g/4" in all directions ta 1 '-0�� from vault. <br /> ' C. Bedding for all vaults, and eny handholes larger than 3'-0" x 3'-0" , <br /> I shall be 0'-6" of pea gravel or sand. For handholes smaller then <br /> 3'-0" x i�-0'� shall be 0'-3�� pea grevel or sand. <br /> ( D. All o!her beckfill shell be free of debris larger than 6" in <br /> dic+meter. <br /> ,5,o5-z (�5 <br /> s�-o� <br />