My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 3:25:24 PM
Creation date
3/9/2017 5:32:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1015
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02221 155UE A <br /> TRENCHING, E3ACKFILLING AND COMPACTING 13 JULY 84 <br /> URT 2 <br /> PARTI - GENERAL <br /> I.01 UESCRIPTION <br /> A. Related Work Specified [Isewhere: <br /> I. Storm Drainage, Section 02400 <br /> 2. Water Distribution, Section 02713 <br /> 3. Sanitary Sewerage System, Section 02722 <br /> B. Description Of Work: This work shall consist of ihe necessary excavating <br /> for storm drains, sanitary sewers, water lines and underground power ir <br /> conformance with ihe drawings and specifications; and }he backfilling of <br /> completed culveris, poipe drains, sanitary sewers ond other structures and <br /> ihe disposal of all excavated material. <br /> 1.02 QUALITY ASSURANCE <br /> A. Standard Specifications: The "City of Everett Design and Consiruction <br /> Standards and Speci6ications," dated April 25, 1984, sholl apply unless <br /> modified herein. <br /> PART 2 - MATERIALS <br /> 2.01 DEDDING <br /> See Section 3.3. 13.1 for bedding materials. <br /> PART 3 - EXECUTION <br /> 3.01 DEDDING <br /> A. See City of [vereTt Standard Drawing No. 317 for typical irench section. <br /> B. When hedding material is used, the trench shai� be excavated 4 inches below <br /> ihe bottom of the pipe and filled up to pipe grade with granular bedding <br /> material. <br /> C. Where ro�k, hardpan, or other unyielding material is encountered, it shatl be <br /> removed below ihe bedding grade for a depih of at least 12 inches. The <br /> widih o( the exravation shall be one foot greater ihan ihe horizontaloutside <br /> diarneter of the pipe. The excavation shall be backfilled with bedding <br /> material as described in 2.01. <br /> 02221-I <br /> 8301 <br /> ,� , <br />
The URL can be used to link to this page
Your browser does not support the video tag.