My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7007 SEAWAY BLVD 2018-01-02 MF Import
>
Address Records
>
SEAWAY BLVD
>
7007
>
7007 SEAWAY BLVD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 3:45:16 PM
Creation date
3/9/2017 5:39:11 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7007
Notes
NARBECK WETLANDS SANCTUARY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> 7. Do you have any pl�n� for futnre additloe�, e:pantion, or further aetivity rdated to or I <br /> coenected with t6b propotd! If yn,ezplain. <br /> This project crcates a wetland compmution bank for future projects(which may include the Mein <br /> Runway Safety Area improvement project,Northwest Taritoria and North Ramp development, <br /> •end construction of Paiu►e Fidd Boulevard)at the AiepoR that will impact�vetlands. Future <br /> construction projects will go through separate SEPA re:dews. I <br /> Ownership of tltis projecc will be transfprrcd to the City of Evaett Department of Parks and i <br /> Rxreation. The City ef Everett Parks Comprehensive Plan e,gtabGshed a goal of adding a trail ' <br /> system to Possession Sound. This trail system could potentislly wnnect to this projax. <br /> 8. List aoy environmental inform�tion you know�about that hu beeo prep�red,or will be <br /> prepared,direcdy rclated to thu propo�al. <br /> Geotechnical Evaluation for Wetlend 1lrtigetion, Terra Associates,January 1995 <br /> Draft Prograrnmatic EIS for SW Everett/Paine Field Area, Prcliminary June 1?95 i <br /> US Arrt►y Corps of Enginars 404 Pertnit Application Spring ;995 <br /> Environmental Risk Assessment, SnoCo Public Works Design/Construction, Spring 1995 <br /> Mitigation Construction Design Plan, Winter l995 <br /> 9. Do you know wheth�r appliutions a�r pending for govemmeetsl epprovab of other proposals <br /> directly afTecting the property covered by your propoaali If yea, e:plain. <br /> US Army Corps of Enginxrs 404 Pertnit <br /> Snuhomish County Airport Wetlend Compensation Bank Memorandum of Agreement I <br /> 10. Liat any govemment approvals or permit� that will be needed for your propo�al, if known. � <br /> US Army Corps of Engineers 404 Perntit ,,o <br /> Ciry of Everett Grading Pertnit�/�wPr�c. G�.�-r.6y /,t�+.�.�"12o�-y� <br /> Hydraulic Project Approval from Washington Department of Fish& Wildlife r <br /> Noxious Weed Removal and Transport Permit <br /> Stortnwater Baseline General Pcrtnit for Construction <br /> Snohomish County Airport Wetland Compensation Bank Memorandum of Agreement I <br /> I <br /> � <br /> I <br /> 2 �7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.