My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7007 SEAWAY BLVD 2018-01-02 MF Import
>
Address Records
>
SEAWAY BLVD
>
7007
>
7007 SEAWAY BLVD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 3:45:16 PM
Creation date
3/9/2017 5:39:11 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7007
Notes
NARBECK WETLANDS SANCTUARY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D <br /> The Watershed Com �Q��d(� <br /> � 1 919g6 � <br /> Memorandum ciTy��..._..... ... <br /> Lennie Rae C oket a d B 11aLewallenV Snoho�m sh Co�ty Airport Pub,,C w�ks��Pt.T T <br /> Clay Bush, Fluke Corporation <br /> Daryl Bertholet and Jay McGill, City of Everett Pazks a�d Recreation <br /> Gary Doughty, Everett Planning Department <br /> Kirk Brooks, Wayne Wentz and Jane Zimmerman, City of Everett Public Works <br /> John Barker and John Galloway, Galloway Barker Architects `� <br /> David Hamlin, David I. Hamlin dc Assoaates <br /> Bob Montgomery, Montgomery Water Group, Inc. <br /> From: Bill Way and Kathy Smith, The Watershed Company <br /> Date: November 18, 1996 <br /> Re: Nazbeck Swaatp Interpmtive Pazk,Nov. 1,1996 Pm-App. Design Meeting Notes, <br /> Revised Version <br /> On Friday, Nov. 1, 1996, the above listed individuals attended a pre-applicarion <br /> meeting for the Narbeck Swamp InterpreHve Park project. A number of issues were <br /> discussed and are summarized in the following meeting notes. <br /> Rntranrr Rnad <br /> • The sidewalk at the entrance needs to be located westward of where it is show:►. <br /> • The sight distance concern on the south side could be resolved by moving the <br /> trail closer to the road, thereby forcing tree planting away from road. <br /> • There needs to be a left hand turn lane and a through lane to the exisHng Fluke <br /> site. <br /> • Clay Bush, of Fluke, noted that the road needs to be built out to the north property <br /> linc. Public Works indicated that barriers would need to be put up if this was done. <br /> • David Hamlin stated that a signal pole needs to be added on the Fluke site. <br /> � B ,si Pi;�l ()ut <br /> � • The school bus pull out nee3s to be moved further south, if possible. <br /> + • T'he transit pull out is O.K. as is. <br /> Par i g i.nt Rz rraon Hn �sr Rnad Matorialc <br /> • The parking lot layout is O.K. as is. <br /> • Public Works voiced concern over maintaining painted lines for the parking <br /> stalls on a crushed material surface. <br /> • The Parks Dept. voiced concern over future maintenance of a crushed material <br /> 1 <br /> 1�41U Sfarket S�rcet • P.O.Box ll80 • Kirkland • 1VA 98033-0918 •Phnne("<U6}822-5242• Fax(206)827-8136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.