Laserfiche WebLink
Y <br /> surface and stated that they would ;nobably pave it once park ownership was <br /> transferred to them. <br /> • The benefits of and the motivations behind using a crushed recycied material <br /> were discussed and determined to be a priority. <br /> • It was resolved that a aushed materIal rnuld be used, but further investigation <br /> needs to be done as to whether areas that undergo a lot of wear & teaz, like the entry <br /> way into the pazking lot, need to be asphalted. <br /> • The parking stall painted line issue could be resolved through the use of surface <br /> stall stops and stall guide boards that are made out of recyded materials. Perhaps <br /> just the stall stops would be sufficient. <br /> • Further discussion is needed with the Parks Dept with regard to future <br /> maintenance agreements. , <br /> � <br /> F1Lka Arrnas Rrtad <br /> • It was agreed that the road width, past the through lane portion, would be 28'. <br /> nra� <br /> • Jane Zimmerman said she would like to further review the drainage basin <br /> boundaries. <br /> • .�ny drainage within the Narbeck basin that could be dtained to the standing pool <br /> of Narbeck Swamp would not need to be detained, as this is already serving as a <br /> regional detention facility. <br /> • It is essen6al that the peak storm water flows leaving the site cannot be inaeased. <br /> • All drainage water from paved impervious surfaces into wedand areas must be <br /> treated prior to discharge. <br /> • A wet vault dc wedand treatment cell, per City of Everett wetpond standards, <br /> would be sufficient to use for water treatment. <br /> • Storm water fadiities need to be located such that they can be accessed for futu:e <br /> maintenance. <br /> Racfrnnmc <br /> • A power source must be installed that is suffident to provide heating of the <br /> chaseway to prevent pipes from freezing. Insulation might also be pazt of fulfilling <br /> this need. <br /> • The roof configuration eliminates the need for gutters or scuppers on the <br /> restrooms. However, tr►e Parks Dept. want to make sure that the roof configuration <br /> is such that people don't get doused by water going in and out of the building. <br /> • The consensus was to proceed with design/development of a restroom building <br /> in the style of a forest service-type building using stone and timbets. <br /> 1 <br /> Kinsk <br /> The Kiosk is O.K. as is. <br /> ITfPi'n[PtIVP S}IPIfPT <br /> • Everyone agreed that the shelter is an important focal point of the project. The <br /> idea of using a beaver dam as a model was supported. <br /> 2 <br />