My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7007 SEAWAY BLVD 2016-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
7007
>
7007 SEAWAY BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 3:38:51 PM
Creation date
3/9/2017 5:41:20 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7007
Notes
WETLANDS AS-BUILTS DOCS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'NARBECK WETLAND COMPENSATION BANK # 2 <br /> REPORT ON AS-BUILT CONDITIONS <br /> INTRODUCTlON <br /> Narber,k Wetland Compensatien Bank #2 is one of two sites which comprise the <br /> • Snohomish County Airport Wetland Compensation Banking Program. The data <br /> generated for this report are purs��qnt to the requirements of the Memorandum of <br /> Agreement and Implementation Manua/ A�1 which govern the Program and the <br /> development of the bank sites. This report documents the existing as-built conditions <br /> at the Narbeck site. <br /> This report has been organized based on Appendix E to the hlemorandum of <br /> Agreement, "Elements of a Monitoring Plan and Report, Documenl of As-Built <br /> Conditions". The Snohomish County Airport has generated sufficient inforrt�ation after <br /> the construction of Narbeck WCB, as demonstrated in this report, to assess <br /> compliance with permit conditions and project goals and objectives, and to provide a <br /> baseline for future compliance monitoring. <br /> The outcome of the approvai of the as-built conditions is the release of 50% of the <br /> credit eamed at the Narbeck WCB. It is the expectation of the Snohomish County <br /> Airport that, barring valid and docume�ted objections, fhe recommended Mitigation <br /> Conversion Ratios and Impac: Compensation Ratios will be approved by the Oversight <br /> Committee (OC) and relea�e of the credits will be a matter of completing the <br /> documentation required by the MOA. The matrix below reiterates the <br /> recommendations of the OC for bank credits in reference to the mitigation design <br /> approved in Implementation Manual N1. Please note that the acreages reflect the as- <br /> built condEtions rather than the acreages ant�cipated in the conceptuai plan. <br /> NARBECK OFF-SITE SNOHOMISH COUNTY AIRPORT WCB I2 <br /> Wetl�nd Mkl �tion Prsiervetion Mltip�tion TOTAL <br /> Created Enhanced Enhanced Preserved Preserved Preserved <br /> Wetlands Wetlands Butters Wetlands 8utters EPA <br /> Aren (Ac.) 7.66 0.6 72.1 19.36 397 1.87 45.56 <br /> Mitigetion <br /> Conversfon 1:1 1.75:1 2:7 5:1 5:1 5:1 N/A <br /> Ratio <br /> Bank 7.66 0.34 6.05 3.87 0.79 0.37 19.08 <br /> Crodits <br /> Impact <br /> Compensa- 2:1 2;1 2:1 2:1 2:1 2:1 N/A <br /> tion Ratio <br /> Total Wetland Cr�dlts 14.05 <br /> TotN Preservation Crsdits 5.03 <br /> Totel WCB N2 Bank Credits �g.pg <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.