Laserfiche WebLink
Mr.Bilt Way <br /> Ju[y 25, 1996 <br /> PROJECT DESCRIPTION <br /> We wecti provided with a preliminary grading plan dated Febivary l996, prepared for development of <br /> the �Iarbeck site. This plan shows construction of an interpmtive shelter, restrooms, geenhouses, <br /> nucsery piant plots,an�t parking and driveway facilities. A small amphitheater and naturc trails aze also <br /> included in the development <br /> Thocgh floor elevations of thc swcturcs arc not shown, it appears they w•ill be placed neaz existing site <br /> grades. We expect the structures �,vill be nlatively light,with foundation loads ef about one kip or less <br /> per lineal foot along load-bearing walls. <br /> A recently provided sketch, dated June 7, 1996, shows slightly rcvised locatians of the swctures. The <br /> sketch shows reorientation of the restrooms and relocation of the interpmtive shelter, grcenhouses, and <br /> nursery plant plots to approximately 20 feet south of the locations shown on the preliminary �ading <br /> plan. <br /> Review of the grading plan indicates two pond areu will be constructed north of the proposed visitor <br /> facilities. Pond bottom elevations will be approximately 522 feet and 524 feet at the eastern and westem <br /> pond areas, respectively. Conswction oF these ponds will require excavation of up to l4 feet below <br /> existing site gndes. The grading plan indicates pond excavation and landscaped fill slopes will be <br /> graded to inclinations as steep as 13:1 (Horizontal:VeRical). <br /> The rcco�nmenda;�ons contained in this rcpoR arc based on the above design features. We should <br /> review final design drawings to verify that our recommendadons have been properly interprcted and to <br /> supplement them, if required. 1n addition, we should provide construction observation and tesdng <br /> servica as needed during construction. <br /> SITE CONDITiONS <br /> We conducted our field investigation for this phase of our work on July 3, 1996. The following sections <br /> summarize the results of our exploration. <br /> Surface <br /> The site lies within an undeveloped arca bounded to the south by Narbeck Swamp and to the west by <br /> Seaway Boulevard. The site is accessed from Seaway BoUlevard by a gravel road leading eatt into the - <br /> site and tuming south toward Narbeck Swamp. <br /> Most of the site is tlat. A,broad,two to four-foot high knoll lies at the site's eastem margin adjaant to <br /> the edge of the swamp. A steep, approxim�tely six-foot high (maximum) embankment lies along the <br /> westem margin of the site adjacent to the edge of Seaway Boulevard. The site's southem margin slopes <br /> ver�gently to the south toward Narbeck Swamp. <br /> Project No.T-2736-1 <br /> Page No.2 <br />