My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3206 WAVE DR 2016-01-01 MF Import
>
Address Records
>
WAVE DR
>
3206
>
3206 WAVE DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 8:09:48 AM
Creation date
3/9/2017 8:09:30 AM
Metadata
Fields
Template:
Address Document
Street Name
WAVE DR
Street Number
3206
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoTesl Services,Inc. June 3,2005 <br /> Baldwin Residence,3206 Wave Drive,Everetl,WA Job No.5233 <br /> • The exposed subgrade surface and excavated siope should be observed and <br /> evaluated by qualified personnel under the direction of a geotechnical engineer <br /> to insure that our design assumptions are met. The minimum 6 inch thick <br /> concrete pad or compacted crushed gravel base can then be constructed. <br /> • We recommend that the walls be embedded a minimum oi one and one half <br /> blocks below the grade in front oi the wall. Fill used to backfill in front of the <br /> construcled walls should consist of suitable native soil or importzd granular <br /> material thal is compacled in place. <br /> • Drainage is essentiai for proper performance of retaining walls. The wall design <br /> assumes drained conditions and does not allow for hydrostatic pressure buildup <br /> behind the walls, Figure 4, Wall Design Detail. The design therefore requires <br /> posilive drainage as detailed on the typical cross sectional drawing. A one-foot <br /> thick free draining gravel layer siiould be placed immediately behind the blocks. <br /> This drainage layer may consist of pea gravel, drain rock or a clean screened (no <br /> fines) crushed rock. The drainage layer should be separated from the native <br /> back fill, within the reinforced zone, by using a non-woven filter fabric such as <br /> Amoco 240N, or equivalent. <br /> • Backfill placed behind the walis should be piaced on a horizontal surface in <br /> uniform lifls and be compacted to a dense and non-yielding condition. The fill <br /> should be olaced in 8 to 10 inch, loose horizontal lifts and thoroughly compacted. <br /> Within the active zone behind the wall, the fill should be compacted to 95% of the <br /> maximum dry density as determined by ASTM D-1557 test procedure except <br /> within 2 teel immediateiy behind the wall where 90% is recommended. The <br /> backfill material should be generally granular, inorganic and free of any debris. <br /> We do not recommend using a clay or silt soil wilhin lhe reinforced backfill zone. <br /> • The contraclor should ensure that the geogrid installation for INSE type walis is <br /> properly oriented in the machine direction to achieve the strengths used in our <br /> design. The grid is recommended to be backfilled from the wall back in order to <br /> ensure the grid is properly tensioned. Loose grid bubbles or folds should not be <br /> allowed within the reinforced soil zone. <br /> • Temporary excavations in excess of 4 ft should be shored or sloped in <br /> accordance with Safety Standards for Construction Work Part N, WAC 296-155- <br /> 657. Temporary unsupported excavations in dense, undisturbed native soils <br /> without seepage (Type A soil) may be sloped as steep as '/,H: 1V. All other soil <br /> unils and all soils units with seepage are Type C soils and should be at 1YzH: 1V <br /> or ilatter. Flatter siopes or temporary shoring may be required in areas where <br /> groundwater flow is present and unstable conditions develop. The contractor is <br /> responsibie for monitoring and maintaining safe excavation conditions. <br /> Please re(erence the Allan Block construction and instailation specifications for other <br /> ilems nol specifically addressed above. <br /> Page 5 of 7 � � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.