My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
820 WAVERLY AVE 2018-01-02 MF Import
>
Address Records
>
WAVERLY AVE
>
820
>
820 WAVERLY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2022 10:01:31 AM
Creation date
3/9/2017 8:39:11 AM
Metadata
Fields
Template:
Address Document
Street Name
WAVERLY AVE
Street Number
820
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__ i <br /> i � ' � �r ' <br /> � <br /> � <br /> GE0IECHIVICAi. ENGiNEERING STUDY i <br /> � EVERETT COMMUNITP COLLEGE <br /> DAY CARE CENTER <br /> � EVEREI7', WASHING'!`UN • <br /> E-4Z12 � <br /> � INTRODUCfI4�[ � <br /> , <br /> � Proiect�scri4lioIl <br /> The subject site is located at northwestern rnrner of Waverly Avenue and Tower Street, <br /> Everett, Washington approximately as indicated on the Vicinity Map, Plate 1. The purpose <br /> of this study is to explore the existing subsurface rnnditions at the site and, on this basis, <br /> I to develop geotechnical recommendations for the proposed site development. <br /> At the time our study was petformed, the site, proposed building locsstions, and our <br /> exploratory locations were approximately as sho�� the Test Pit I.ocation Plan, Plate 2. � <br /> We understand that the structure will be two- ory building. We have estimated the design <br /> � loads, based on our past experience. The mum dead and live loads are expected to be <br /> as follows: <br /> � Walt loads - 3 kips per linear foot <br /> � Cc�lumn loads - 30 kips <br /> • Slab loads - 150 psf <br /> If any of the above design criteria change, we should be consulted to review the <br /> recommendations contained in this report. In any case, we recommend that Eanh <br /> Consultants, L�c. (ECI) be retained to perform a general review of the Cnal design. <br /> ,S�pAg �f Services <br /> We performed this study in general aceordance with the scope of services outiined in our <br /> November 22, 1988 proposal. On this basis, our report addresses: <br /> • subsurface soil and groundwater conditions; <br /> • suitability of existing on-site materials for use as fill, or recommenda- <br /> tions for imponed �ll materials; <br /> • site preparation, grading and earthwork procedures, including details of <br /> fill placement and compaction; <br /> • short-term and long term groundwater management and erosion control <br /> measures; <br /> Earth Consultants, Inc. <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.