Laserfiche WebLink
,, . � c � <br /> � E-4212 <br /> I Harris-Tseng Architects pa� � � <br /> December 30, 1988 I <br /> ' i <br /> IWe have provided you with two altemative pavement seccions for the parking areas: <br /> t , � Two inches of Asphalt Conerete (AC) over four inches of Crushed Rock Base <br /> (CRB) material, or � <br /> i <br /> � � two inches of AC over three inches of Asphalt Treated Base (ATB) material. (You <br /> may wish to consider the use of a base course of four to six inches of pitrun <br /> granular soil compacted to 95 pereent of ma�cimum dry densiry beneath the ATB). <br /> Because of the general nature of the site soils, and because construction is likely to be ; <br /> conducted in the wetter winter months, we recommend you select the ATB pavement section• <br /> � This will not only provide you with a rnmpetent "blacktop" surfa a aa�m�etent surfaceton <br /> site from construction activ►ty, but will also provide a clean, dry P <br /> which to store and protect construction matenals. � <br /> � <br /> i.iMITAT(ONS <br /> � Our reconvnendations and conclusions are based on the site materials observed, selective <br /> I laboratory testing, engineering analyses, the design information provided us by your architect, <br /> and ou� experience and engineering �udgement. The conclusions and recommendations are <br /> professional opinions derived in a manner rnnsistent with that level of care and skill <br /> ordinarily exercised by other members of the profession currently practicing under similar <br /> conditions in this area. No warranty 'ss expressed or implied. <br /> The recommendations submitted in this report are based upon the data obtained from the <br /> test piu. Soil and groundwater conditions between test pits may vary from ihose <br /> encountered. The nature and eztent of variations between our exploratory locanons may not <br /> become evident until construction. If variations then appear, ECI shouid be requested to <br /> reevaluate the recommendations of this report and to modify or verify them in writing prior <br /> to proceeding with the construction. <br /> Additional Services <br /> We recommend that ECI be retained to perform a general review of the final design and <br /> specifications to verify that the eart':�work and foundation recommendations have been <br /> properly interpreted and implemented in the design plans and in the construction <br /> spec�ficat�ons. <br /> We also recommend that ECI be retained to provide geotechnical services during <br /> construction. This is to observe compliance with the design concepts, spccifications or <br /> recommendations and to allow design changes in the event subsurface conditions differ from <br /> those anticipated prior to the start of construction. <br /> Earth Consultants, Inc. <br /> R <br />