My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4777
>
Resolutions
>
Resolution 4777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 9:50:50 AM
Creation date
3/9/2017 9:50:31 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4777
Date
6/30/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 Six Year Transportation Improvement Program <br /> Washington State Department of Transportation <br /> -en <br /> Agency Everett From 2000 to 2005 <br /> County No. 31 Hearing Date 6/23/99 <br /> City No. 0420 Adoption Date 6/23/99 <br /> MPO PSRC - <br /> Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. z - - Fund Source Information - - Expenditure Schedule Projects Only <br /> m B. Bridge No. E N m c (Local Agency) <br /> e m a C. Project Title ;a ° Federal Funding RAN <br /> ri FSp E D. Street/County Road Name or Number ° in m ?=' Phase Federal Federal State 4th Required <br /> a� E. Beginning MP or road- EndingMP or road E Project Start Fund Cost byFund State Local Total • Envir. Date <br /> u. Z g g Phase Funds Funds Funds 1st 2nd 3rd Thru Type <br /> F. Describe Work to be Done (mn✓ddryyyy) Code Phase Code 6th (M >7 <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 • 17 18 19 20 21 <br /> 16 4 1 Phases in Project 04 P 1.0 C PE 2/1/2002 200 200 1200 <br /> p No <br /> 100th Street SW Improvements T <br /> 100th Street SW O <br /> Airport Road to Evergreen Way _ <br /> Design and Construct Road Widening and Other 1 Totals 200 200 200 <br /> • <br /> 17 1 2 Phases in Project 05 S 0.5 c PE 1/1/99 60 601 • <br /> -- -- <br /> p CN 911/99 _ 520 520 520 No <br /> Cedar Street Improvements 1 T <br /> Cedar Street • 0 <br /> • ' Everett Avenue to Pacific Avenue <br /> 1 Design and Construct Road Widening and Other Totals 580 580 520 <br /> 17 2 3 Phases in Project 05 P 1.0 1 C PE 8/1/2002 <br /> P RW 5/1/2003 Yes <br /> 36th Street Park/Ride Lot and Access Improv. T CN 3112004 12000 3000 15000 750 14250 <br /> 36th Street,Broadway,and 41st Street O <br /> Smith Street to 1-5 <br /> Design and Construct Park and Ride Lot and Access Totals 12000 3000 15000 750 14250 <br /> 17 3 3 Phases in Project 04 P 0.5 .' C PE 1/12003 1 <br /> RW <br /> P 7/1/2003 Yes <br /> 37th Street Improvements CN 1/12004 ,,I 1200�'I 240 1440 ' 1440 <br /> T <br /> 37th Street 1 , O <br /> Rucker Avenue to Broadway <br /> Design and Construct Road Widening and Other 1 Totals 1200 240 1440 1440 <br /> 17 4 4 Phases in Project 08 P 0.2 1 C RW 9/1/99 I , EA <br /> P CN 4/1/20001 • STP(U)! 16671 1667 16671, Yes <br /> California Street Overcrossing T CN 4/1/2000 Disc etio 833 5000 I 2500 I 8333 40001 4000' <br /> California Avenue . <br /> O nary • 12/1/99 <br /> • West Marine View Drive to Waterfront• <br /> Design and Construct Arterial Overcrossing ! Totals 2500 5000 2500 10000 5667 4000 <br /> 17 5 2 Phases in Project 05 S 0.5 C PE • 3/1/99 10 16' 261 1. <br /> N/A P CN 4/1/2000 90 144. 234 234: No <br /> Holly Drive Improvements • T <br /> Holly Drive 0 <br /> 92nd Street to Southern City Limits <br /> Design and Construct Pedestrian/Bicycle Improvements Totals 100 160 260 234 <br /> : <br /> 17 6 2 Phases in Project OB P 02 C PE 1/1/2003 CN 1/1/2004 ' ' <br /> 3000 600 36001 3600 No <br /> P <br /> Everett Ave.BNSF Overcrossing to Railway Ave. T <br /> Everett Avenue 0 <br /> East Grand Avenue to Railway Avenue <br /> Design and Construct Arterial Overcrossing j ' Totals 3000 600 3600 3600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.